INSTALLATION INSTRUCTIONS FS006

For Technical Support: www.panduit.com/resources/install_maintain.asp

Drawer in home position

Page 9 of 11

Figure 9C

Drawer in extended position

Figure 9B

Fixed 

T

AK

-T

Y

 

Tape

Grommet

Route fiber through grommet as shown. 
Use enough cable length to ensure one 
complete loop 

(approx. 45" [1.15m])

 of 

individual fibers around FOSM slack 
spools. 

Route 900µm buffered fiber from the 
trunk cable and splice to pigtail per 
instructions in FS001, 

O

PTICOM

 Fiber 

Optic Splice Module Installation 
Instructions.

 
Leave enough jacketed slack so when 
the drawer is fully extended the cables 
are not put under tension. However, do 
not use so much slack that the drawer 
cannot be returned to its home position. 
(See Figure 9C)

Use 

T

AK

-T

Y

 Tape to secure fiber cords at 

cable entry location and other points as 
shown.

Individual 
fiber 
breakout 
point (See 
Fiber 
Breakout 
Detail on 
page 7).

Free-floating 

T

AK

-T

Y

 

Tape

Use

 T

AK

-T

Y

 Tape to

fasten cable to fence.

Sub-unit 
tubes

“A”

“B”

Cable length 
between point 
“A” and point 
“B” is approx. 

36" [.914m].   

Summary of Contents for FCE1U

Page 1: ...ble specification sheet for the specific cable in use Follow TIA EIA 568 A 569 606 and 607 installation guidelines where applicable Care should be taken when opening or closing a fully loaded drawer i...

Page 2: ...at this stage grommet will be installed after enclosure is mounted to rack Note Cover removal is not required for proper fiber optic cabling installation To remove the cover if desired unscrew the fo...

Page 3: ...sure Install grommet following the proper cutting diagram Cut the small circle for 1 diameter innerduct Cut the large circle for 1 1 2 diameter innerduct Cut the straight lines when not using any inne...

Page 4: ...into the enclosure as shown Once mounted fully seat NyLatch fasteners to secure the cassette Figure 7 Figure 7A Cassettes Up to 4 for FEC1U FCE1UA Up to 8 for FCE2U Fully extend drawer to ensure prope...

Page 5: ...not use so much slack that drawer cannot be returned to the home position See Fig 7C Use TAK TY Tape to secure fiber cords at cable entry location and other points as shown Drawer in extended position...

Page 6: ...ation Position FAPs between upright flanges as shown Once mounted fully seat NyLatch fasteners to secure FAPs Slack Spools Field Termination or Pre Terminated Trunk Installation Figure 8 Figure 8A Iso...

Page 7: ...approx 52 1 32m of individual fibers around slack spools Leave enough jacketed slack so when the drawer is fully extended the cables are not put under tension However do not use so much slack that dr...

Page 8: ...top of each other and snap in place If 4 FOSMs are to be installed in the FCE1U or FCE1UA side latches on top module must be broken off to close enclosure drawer Position FAPs between upright flanges...

Page 9: ...nd splice to pigtail per instructions in FS001 OPTICOM Fiber Optic Splice Module Installation Instructions Leave enough jacketed slack so when the drawer is fully extended the cables are not put under...

Page 10: ...ing tray flange as shown Push grommet plunger through bend radius clip and sliding tray flange holes Finally fully seat plunger into grommet securing bend radius clip Bend Radius Control Clips Plunger...

Page 11: ...uit com resources install_maintain asp Re install top cover front door and rear door assemblies if removed during fiber installation Attach Laser Warning Label and Caution Label where they are clearly...

Reviews: