background image

For Technical Support: www.panduit.com/resources/install_maintain.asp

INSTALLATION INSTRUCTIONS

 © Panduit Corp. 2010

FS012

Use (2) #12-24 x 1/2" or (2) 
M6x1 screws (provided). 
Repeat for other side.

Install the bend radius posts on each side as shown.

Determine where the cable will enter the enclosure. 
Carefully remove the knock-out at that entry location 
of the fiber tray making sure not to damage the 
surrounding sheet metal. DO NOT install grommet at 
this stage, grommet will be installed after enclosure 
is mounted to rack.

Place enclosure mounting brackets at desired 
position on the rack. Mount the enclosure to the rack 
using (4) #12-24 x 1/2" screws. Use the (4) M6x1 
screws if mounting to a metric rack.

Figure 2

PREPARATION AND RACK MOUNTING

Fastening tabs can be 
used to secure slide out 
tray using two additional 
#12-24 x 1/2" or M6x1 
screws (not provided).

Align notches with 
RU markings.

Page 2 of 10

Figure 3B

Figure 3C

Enclosure Mounting 
Bracket
(typical opposite side)

Figure 3A

Bend Radius 
Post

Summary of Contents for FCE4U

Page 1: ...NG UNMATED CONNECTORS MAY EMIT INVISIBLE LASER RADIATION DO NOT LOOK DIRECTLY INTO THE END OF THE CONNECTOR DO NOT INSPECT WITH MAGNIFYING DEVICES MAINTAIN CAP ON UNMATED CONNECTORS Care should be tak...

Page 2: ...surrounding sheet metal DO NOT install grommet at this stage grommet will be installed after enclosure is mounted to rack Place enclosure mounting brackets at desired position on the rack Mount the en...

Page 3: ...re Install grommet following the proper cutting diagram See Figure 4A Cut the small circle for 1 diameter innerduct Cut the large circle for 1 1 2 diameter innerduct Cut the straight lines when not us...

Page 4: ...lted down cables omitted for clarity Opticom QuickNet Cassette Installation Route fiber through grommet to fiber cassettes as shown Leave enough slack so when the drawer is fully extended the cables a...

Page 5: ...For Technical Support www panduit com resources install_maintain asp INSTALLATION INSTRUCTIONS Panduit Corp 2010 FS012 Figure 6C Tray in home position cover omitted for clarity Page 5 of 10...

Page 6: ...punch hole into adhesive mounts Note spool orientation Position FAPs between upright flanges as shown Once mounted fully seat NyLatches to secure FAPs Fully extend tray to ensure proper amount of slac...

Page 7: ...tended the cables are not put under tension DO NOT use so much slack that the drawer cannot be returned to its home position See Figure 7C Use Tak Tys to secure fiber cords at cable entry location and...

Page 8: ...der note orientation The remaining FOSMs are stacked on top of each other and snap in place after termination of lower tray Position FAPs between upright flanges as shown Once mounted fully seat NyLat...

Page 9: ...lete loop of individual fibers around splice tray slack spools See instruction sheet for splice trays Leave enough jacketed slack so when the drawer is fully extended the cables are not put under tens...

Page 10: ...eld to allow room to route patch cords under the tabs to the cable manager Plug fiber connector into FAP adapter Route patch cords down to fiber manager base under fiber manager fingers and Bend Radiu...

Reviews: