background image

INSTALLATION INSTRUCTIONS     CM296A

For Technical Support: www.panduit.com/resources/install_maintain.asp

(8) #10 Split Lock Washers

Step 1: Power Supply Installation

1.1 Install the 24 VDC Power Supply to the 35mm DIN rail. 

Refer to the power supply instruction sheet for proper 
wiring techniques and safety.

1.2 Run a lead from the inside "+" position on the output 

side of the power supply to the switch.

1.3 Run a lead from the inside " - " position on the output 

side of the power supply to the switch.

1.4 Terminate the leads to the switch per the instructions 

provided by the switch manufacturer.
Note: Verify the switch being installed is 24 VDC.

1.5 If installing the optional fan, complete the following after 

the fan has been installed and wired.
Use the Adhesive Backed Mounts and P

AN

-T

YS

 to 

manage the wires and secure them to the inner panel. 
Save a couple adhesive mounts and P

AN

-T

YS

 to 

manage and secure the incoming power lines to the 
inner panel.
Note: Refer to figure 1 for an example of how the wires 
can be routed.

Power
Supply

1

Area for Switch

Adhesive Mount

2

(Previously installed cables removed from view for clarity)

2.1 Insert the studs of the gland plate through the holes 

on the enclosure.

2.2 Verify the gland gasket is flat and positioned evenly 

between the plate and the enclosure.

2.3 Secure the plate to the enclosure using the supplied 

#10 Flat Washers, #10 Split Lock Washers and #10-
32 Nuts. Torque the nuts to 5 in-lbs.

Step 2: Gland Plate Installation

 

(sold separately)

 

PANDUIT Part #’s:

IAECGP - Industrial Automation Enclosure Connector Gland Plate

IAEBGP - Industrial Automation Enclosure Blank Gland Plate

 

Page 2 of 5

3.1 Remove the cover plates from the enclosure.

3.2 Snap the IP54 Fan from the outside into the bottom 

opening near the gland plate. Make sure the louvers 
are angled toward the bottom of the enclosure.

3.3 Snap the IP54 Exhaust Filter from the outside into the 

top opening of the enclosure. Make sure the louvers 
are angled toward the bottom of the enclosure.

3.4 Install the Thermostat to the DIN rail of the enclosure.

Step 3: Optional Fan Kit Installation 

(sold separately)

 

PANDUIT Part #:

IAEFK54 - Industrial Automation Enclosure Fan Kit

3

Fan

Exhaust
Filter

Thermostat

(Previously installed cables removed from view for clarity)

(1) Gland Plate
(1) Gland Plate Gasket
(14) IP67 Bulkheads

(14) Patch Cords

(1) Blank Gland Plate

(1) IP54 Fan
(1) IP54 Exhaust Filter

(1) Thermostat

(8) #10-32 Nuts

(8) #10 Flat Washers

(1) Gland Plate Gasket

(8) #10 Flat Washers
(8) #10 Split Lock Washers

(8) #10-32 Nuts

Summary of Contents for IAEIP66

Page 1: ...2 Conduit Fitting Opening for Industrial Enclosure Gland Plate Inner Panel Important Notice Should Fan Kit P N IAEFK54 be integrated into the enclosure P N IAEIP66 the IP rating of the enclosure shall be reduced to IP54 If the enclosure and any active equipment is located in an environment containing conductive particles that have the potential to cause sparks and shorts or the enclosure is placed...

Page 2: ... the gland plate through the holes on the enclosure 2 2 Verify the gland gasket is flat and positioned evenly between the plate and the enclosure 2 3 Secure the plate to the enclosure using the supplied 10 Flat Washers 10 Split Lock Washers and 10 32 Nuts Torque the nuts to 5 in lbs Step 2 Gland Plate Installation sold separately PANDUIT Part s IAECGP Industrial Automation Enclosure Connector Glan...

Page 3: ... the power supply 4 5 Use the adhesive mounts and PAN TYS to manage the wires and secure them to the inner panel Save a couple adhesive mounts and PAN TYS to manage and secure the incoming power lines to the inner panel Step 4 Wiring Optional Thermostat and Fan 5 1 Refer to the power supply instruction sheet for proper wiring techniques and safety If the power supply is not being connected to the ...

Page 4: ...n top of the other two cables and the other end will be secured to the inner panel as shown in Figure 6B 6 4 Secure the cable ends to the grounding studs on the base and the door using the supplied 10 Spring Lock Washers and 10 32 Hex Nuts 6 5 The third 10 AWG Grounding Cable is to be attached to the grounding position on the switch and the other end will be secured to the inner panel 6 6 The 12 A...

Page 5: ...asp www panduit com Page 5 of 5 7 1 Insert the connector end of the patch cord into an IP67 bulkhead 7 2 Insert the plug end of the patch cord into the corresponding port on the switch 7 3 Insert the provided TAK TYS through the shear forms on the inner panel to manage and secure the patch cords within the enclosure Step 7 Patch Cord Installation 7 Patch Cord TAK TY Switch ...

Reviews: