For Technical Support: www.panduit.com/resources/install_maintain.asp
INSTALLATION INSTRUCTIONS
© Panduit Corp. 2016
V00029CX
Page 1 of 3
N
ET
-A
CCESS
N-Type Switch Cabinets
Part numbers:
(N2RCFR, N5RCFR, N8RCFR, N1RCFR Set of Four Cage Nut Equipment Rails)
(N2RTFR, N5RTFR, N8RTFR, N1RTFR Set of Four Tapped Equipment Rails)
Front Equipment Rail Installation
•
Remove existing front rails from cabinet posts (use T25 Torx bit to remove existing screws)
•
Install [2] Front Equipment Rails to Front Cabinet Posts with [5] Countersunk Torx screws per rail (use T25 Torx bit)
•
Use supplied shims (as necessary) to ensure proper EIA spacing of front equipment rails
Countersunk Torx Screw
(use T25 Torx bit)
[5] screws per rail
REMOVE EXISITING
FRONT EQUIPMENT RAILS
(use T25 Torx bit)
Shim
(**use as necessary**)
FALLING EQUIPMENT HAZARD
Remove all equipment installed onto equipment rails before performing any adjustments to equipment rail spacing.
FAILURE TO FOLLOW THESE INSTRUCTIONS CAN LEAD TO SERIOUS INJURY, DEATH, OR DAMAGE TO YOUR EQUIPMENT.
WARNING