INSTRUCTIONS CM408F
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 21 of 24
Cabinet Sealing
Adjacent cabinets may be ganged in one of the following conditions
(see leveling and ganging instructions on pages 4-5)
:
CABINET WITH NO SIDE PANEL adjacent to CABINET WITH NO SIDE PANEL
- Bulb seals of adjacent cabinets firmly contact each other.
Use ganging brackets to maintain firm contact of bulb seals
(see page 5)
.
CABINET WITH NO SIDE PANEL adjacent to CABINET WITH SIDE PANEL
- Bulb seals of cabinet with no side panel rests firmly against
side panel of adjacent cabinet. Cut (4) pieces of 3/16” x 1/2” adhesive foam seal to length and attach along flanges in side panel opening of
each cabinet where side panel is installed. Apply top seal behind grounding clips. Use ganging brackets to maintain firm contact of bulb
seals
(see page 5)
. Side panel must be removed to install foam seals. See Cabinet Post
(Section View).
CABINET WITH SIDE PANEL adjacent to CABINET WITH SIDE PANEL
- Cut (4) pieces of thin adhesive foam seal to length and attach
along flanges in side panel opening of each cabinet where side panels are installed. Apply top seal behind grounding clips. Side panels
must be removed to install foam seals. See Cabinet Post
(Section View).
NOTE:
SFS-KIT is required for end of row cabinet sealing.
INCORRECT BULB SEAL ALIGNMENT
CORRECT BULB SEAL ALIGNMENT
3/16” x 1/2” Adhesive Foam Seal
(only apply when side panel is installed)
Flange in Side
Panel Opening
Cabinet Post
(Section View)
(4) 3/16” x 1/2” Adhesive Foam Seals
(only apply when side panel is used)
Top 3/16” x 1/2” Adhesive Foam Seal
(apply behind grounding clip)
Grounding Clip
Top Side Panel Seal
(Section View)