FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
INSTRUCTIONS CM378
© Panduit Corp. 2008
1.1. Install bonding studs through the inside of the enclosure door until nuts contact the door surface. See
Figure 1.1.
1.2. Install bonding nuts to studs on the outside of the door to hold in place. See
Figure 1.2
.
Page 1 of 2
P
AN
Z
ONE
In-Ceiling Grounding Kit
Part Numbers: PZICGK
Required Components
#12 External
Tooth
Installation: Bonding Studs
(2) Equipment Jumpers
(3) #12-24 Hex Washer
Head
Figure 1.2
Figure 1.1
Enclosure
Door Jumper
#10-32 Thread
Forming
Grounding Bracket w/ESD Port
(4) Bonding Nuts
(2) Bonding Studs
#10-32 Hex
#10
Bonding Studs
w/Nuts
Bonding
Nuts
Attach Building Ground
to Bonding Studs