FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp

INSTRUCTIONS CM227

© Panduit Corp. 2006

Page 1 of 2

P

AN

Z

ONE

 Under Floor Enclosures

Part Numbers: CIFZC4, CIFZC8, CIFZC11, CIFZC4F, CIFZC6F

Part Number

CIFZC4

CIFZC8

CIFZC11

CIFZC4F

CIFZC6F

Required Minimum Floor Depth

6"

8"

14"

10"

14"

The following items are included.

Required Tools

Installation: 

(for floors with stringers)

Figure 1

CIFZC4

CIFZC8

7/16” Open End Wrench
 1/2” Open End Wrench
Phillips Head Screw Driver
Slotted Screw Driver

(1) Foam Kit

(4) Leveler Bolts

(4) Support Brackets, with 
Washers and Nuts

(2 or 4) Cable 

Entry Port Covers

(1) Enclosure

Installation 
Location

Figure 2

1. Select the installation location ensuring there are no obstacles to 
interfere with the installation.
2. Remove five tiles from the floor in the shape of a “+” (See Figure 2).
3. Remove the two adjacent stringers that run between the supports

CIFZC4F

CIFZC6F

CIFZC11

Figure 3

Mounting Bracket for Patch Panel

Leveler 
Bolt

Cable Entry 
Port Cover

Foam Sheets

Stanchion

Support Bracket with 
Washers and nuts

Enclosure 

(CIFZC8 Shown)