PAT1M / PAT1.5M OPERATION MANUAL
PAT1M/PAT1.5M: PA22222A01_03
Page: 12 of 36
Dec., 2007
Remember!!
Once you "Escape" out of the Setup menus, you must repeat the sequence (Steps 3.a.
and 3.b.) to re-enter the higher menu levels (Level 3 thru Level 6).
LEVEL 6 - Language Menu
Set language
Language
Escape
Exit
6. Press
the
"Language"
button to select the language at the next menu in which all menus will be displayed.
Pressing this button will bring up the following display:
LEVEL 6A
English
↑
↓
Select
The menu can be displayed in one of five languages: English, Deutsch (German), Español (Spanish), Italiano
(Italian), or Français (French). The current language chosen is shown at the upper left of the display. To select
another language, press the "
↑
" button to scroll "up" thru the language choices, or press the "
↓
" button to scroll
"down" thru the language choices. When the preferred language is displayed at the upper left, press the "Select"
button to choose that language, and to return to the last menu level (Level 6). All menus will be displayed in the
selected language. If the incorrect language was selected, press the "Language" button to return to Level 8A to
select the correct language.
Press the
"Escape"
button to return directly to Level 1 or 1B (Operator Menus). See Step 1.
The
"MENU"
button is unavailable since Level 6 is the last Setup menu.
Press the
"Exit"
button to return to the last menu level (Level 5). See Step 5.
Remember!!
Once you "Escape" out of the Setup menus, you must repeat the sequence (Steps 3.a.
and 3.b.) to re-enter the higher menu levels (Level 3 thru Level 6).
OPERATION
Follow this operation procedure to correctly apply cable ties. To begin, follow the Start Up Checklist below to assure
safety and optimum system operation.
START UP CHECKLIST
1. Is the PDM Dispenser connected to the air supply? (Refer to the
System Connection
section on Page 6.)
2. Is the air pressure set properly? 65 PSIG with a maximum 10 PSI drop is recommended. (Refer to the
Air
Supply
section on Page 5.)
3. Is the PDM Dispenser loaded properly? (Refer to the
Loading Procedure
section on Pages 7-9.)
4. Is the PHM Feeder Hose securely connected to the PAT1M or PAT1.5M Tool, and PDM Dispenser? (Refer to
the
Loading Procedure
section on Pages 7-9.)
5. Is the Level 1 or 1B Operator Menu displayed on the PDM Dispenser? The Level 1 or 1B Operator Menu must
be displayed on the dispenser for the tool to cycle cable ties. Refer to the
Cable Tie Installation
section (next) for
proper menu display.
electronic components distributor