© Panduit Corp. 2018
OPERATION INSTRUCTIONS PATMBM4.0
Page: 3 of 4
NOTE:
The Tip Collector (3) is not recommended for bench mounted high volume operation. If the tip
collector is used, it must be emptied before it reaches its capacity of 180 cable tie cut-off tips.
NOTE:
For improved performance at extreme angles, use strain relief kit (PATM-RKS); along with
instruction sheet (PA26264A01).
OPERATION
The PATMBM4.0 Bench Mount is operated at the same air pressure as the PAT System, [65 PSIG (4.5 bar)
with a maximum 10 PSI (0.7 bar) drop]. The small regulator that is connected to the bench mount airline is
factory preset and locked. It does not need adjustment. Place the Foot Valve assembly (8) in a convenient
location. Place the bundle or items to be cable tied in the open jaws of the tool and depress the foot valve until
the cable tie is applied, tensioned and cut off. Move the bundle or item to the next desired cable tie location and
repeat as necessary. Refer to the PAT System Operation Manual for further operation, maintenance and
technical information.
CAUTION: DO NOT
insert fingers in between the jaws of the tool.
MOUNTING
Securely fasten the PATMBM4.0 Bench Mount Base (6) to a bench or cart using four 5/16” or 8M
screws. Use mounting template below (not to scale) for hole layout.
Figure 5
REPLACEMENT PART – WT28984B01 CYLINDER ASSEMBLY (Sold separately)