© Panduit Corp. 2013
OPERATION MANUAL
PAT1M, PAT1.5M, PDM
ENGLISH
Page: 28 of 39
The following maintenance of the PAT1M/PAT1.5M System must be completed within the recommended intervals to
ensure trouble-free operation and longevity of the system. Certain extended maintenance procedures must be
performed by your maintenance department. Please notify your maintenance department when these specific
maintenance intervals are reached.
1. Disconnect the PHM Feeder Hose
from the PAT1M or PAT1.5M Tool.
Remove the tip collector from the tool.
2. Place the tool on a table top with the
jaws to the left. Using a 2.5 mm hex
wrench, remove the 4 socket head cap
screws from the left hand housing.
Use a screwdriver to remove the tool
holder bolt (3). Make note of the
correct locations for each of the
screws using Fig. 11.
3. Perform the following maintenance
procedures shown below at the
prescribed interval:
ITEM
QTY
SIZE
1
2
M3 x 25
2
2
M3 x 8
3
1
Tool Holder Bolt
INTERVAL
MAINTENANCE PROCEDURE (See Figure 8 below)
LUBRICANT
Every
100 000
cycles
Clean tool housings and gears of debris (not shown).
(Maintenance department must perform this procedure.)
N/A
1. Lubricate detent cam follower.
(Maintenance department must perform this procedure.)
General Purpose
Light Machine Oil
2. Clean and lubricate all pivots and shafts.
(Maintenance department must perform this procedure.)
3. Oil shaft (1 drop) on each side of Gripper Drive Gear.
(Maintenance department must perform this procedure.)
4. Clean and regrease the Cam on the Front Jaw Gear.
(Maintenance department must perform this procedure.)
Schaeffer's Moly Ultra 800 EP
Fig. 11
Fig. 12