SMARTZONE UPS USER MANUAL
40
Screen #
DC VRLA Settings
Content display
S-04
Battery Capacity setting
(1-200)
The default Battery Capacity setting is 9Ah for the internal UPS battery cartridge.
Increase this number by 18Ah for each EBP unit connected to the UPS unit.
S-05
Group 2 Battery EOD Voltage
setting
(1.75, 1.84, 1.92)
Group 2 is the switchable outlet group. This outlet group may be utilized to power
non-critical loads. The default Group 2 Battery End of Discharge (EOD) voltage
setting is 1.75v. This group of outlets may be configured to turn OFF before the
Group 1 outlets. The lower the voltage setting, the longer outlet Group 2 will stay
ON while the UPS is running on battery. However, the longer this outlet group
stays ON, the less runtime there is for outlet Group 1 which may contain the
critical loads. If all outlets are used for critical loads, then set Group 2 voltage
equal to the Group 1 at 1.75v.
S-06
Bypass Voltage Upper Limit
setting
(120 - 132)
(230 – 264)
The default Bypass Voltage Upper Limit setting is 132Vac for North American UPS
units and 264Vac for European UPS units. These values my be changed in 1Vac
increments/decrements. This value should be set to the maximum voltage that the