SMARTZONE UPS USER MANUAL
75
days between each automatic self-check test. The default is 30 days.
The test time is defaulted to 10 seconds and cannot be changed.
Note:
If Battery Self-Check is enabled in the WebUI through the network card, automatic self-
checking in the UPS should be disabled, or undesired double checking will be performed
automatically.
After making all the necessary changes on this page, press the “Save Config” button to
save the changes.
Press the up and over arrow to return to the Battery Self-Check Setup page.
Note:
Upon returning to this page, the “Automatic Self-Check Mode” line will have “Interval” in
the field at the top of the list. The self-check battery test is now scheduled to automatically run
once every number of days as specified on this page.
Touch Correction Page
The touch correction page shows an x-y cross hair on the screen. The user must touch
the intersection of the cross hair for the first screen calibration. Other x-y cross hairs will
appear in other locations on the screen one by one. The user must touch the
intersection of the cross hairs each time to complete the screen calibration. Upon
completion of the calibration the screen automatically transitions back to the
Maintenance Menu Page.
Common Pages
Common Menu Page
This Common menu page has three common pages which are different between the
single-phase UPS and the 3-phase UPS units.
Single-Phase Common Menu Page
This is the common menu page for the 5-10kVA single-phase UPS units.