SMARTZONE G5 INSTALLATION MANUAL 

 

 

 

 

Section 1 – Introduction 

Classification Overview 

The Panduit G5 Monitored, Switched, Monitored per Outlet, and Monitored & Switched 
per Outlet PDUs (Power Distribution Units) are intelligent PDUs designed to distribute 
power to IT equipment installed into a rack. These PDUs are single-phase (1Ph) or 
three-phase (3Ph) models with electrical metering and switching capabilities. 

Each PDU provides power distribution to IT loads through C13, C19 or NEMA 5-20R 
outlets. The quantity and location of outlets vary by model. The PDUs allow you to 
connect and manage these outlets from a single power connection. The PDUs can be 
managed from a Web interface, or a Command Line Interface (CLI), and viewed from 
the local display.

 

Panduit PDUs are designed for use with all Panduit cabinets and are compatible with 
most third-party data center racks. The PDU models vary in form factor with several 
mounting configurations available. 

 

Panduit Monitored PDU:

 Provides aggregate power monitoring to quickly identify 

potential power issues, and reclaim available or under-utilized power capacity.

 

Panduit Switched PDU:

 Provides aggregate power monitoring and outlet level 

switching capabilities for individual outlets or a group of outlets.  This PDU enables 
power sequencing, rebooting equipment or restrict unauthorized use of individual 
outlets.

 

Panduit Monitored per Outlet PDU

: Provides outlet-level power monitoring to quickly 

identify potential power issues and reclaim available or under-utilized power capacity at 
the outlet level. 

Panduit Monitored & Switched per Outlet PDU:

 Provides outlet-level power 

monitoring and outlet-level switching capabilities for individual outlets or a group of 
outlets.  Power monitoring at the individual outlet level provides actionable management 
data on the power consumption of each connected IT device, enabling the 
redeployment or decommissioning of individual servers to reclaim available or under-
utilized power capacity. 

Summary of Contents for smartzone G5

Page 1: ...G5 PDU Installation Guide...

Page 2: ...egrated Cord Retention 10 Locking Power Cord 11 Section 2 Installing the PDU 12 Vertical PDUs 12 Install Mounting Hardware 12 Vertical 0U PDU Single Installation 13 Vertical 0U PDU Two or More Install...

Page 3: ...SMARTZONE G5 INSTALLATION MANUAL 2 Connecting the PDU to a Power Source 19...

Page 4: ...DU must be reduced by a factor of 0 8 WARNING A risk of personal injury from electric shock and hazardous energy levels exists The installation of options and routine maintenance and service of this p...

Page 5: ...hock install this PDU in a temperature and humidity controlled indoor environment free of conductive contaminants Do not operate near water or excessive humidity 90 maximum noncondensing Ambient tempe...

Page 6: ...SMARTZONE G5 INSTALLATION MANUAL 5 Required Tools The following tools are required for installation Phillips screwdriver Torx screwdriver...

Page 7: ...form factor with several mounting configurations available Panduit Monitored PDU Provides aggregate power monitoring to quickly identify potential power issues and reclaim available or under utilized...

Page 8: ...al in a U space or in the True 0U space between the RETMA rails Hot Swappable Network Management Module allows power distribution during module replacement eliminating downtime 1Gb Ethernet eliminates...

Page 9: ...1U PDUs can be installed in a U position in the rack or in the true 0U space on the side of the rack between the RETMA rails 2U 2U PDUs can be installed in a U position in the rack Load Segment and Ph...

Page 10: ...se PDU Example There is one exception to the different colored receptacles per load segment The three phase half height high density model has two different load segments on each phase as shown in the...

Page 11: ...es equipped with an integrated cord retention feature This will allow you to secure the cord to the outlet without a cord retention bracket 1 Plug in the power cord 2 Using the tie wraps provided slid...

Page 12: ...Power Cord Optional locking power cords can be used on each IEC C13 Image A and C19 Image B outlet on the PDUs Several lengths are available to support any configuration The image below shows the lock...

Page 13: ...When installing the mounting buttons use either mounting holes as a set Mounting button installation outlets facing the center of the rack 1 Align and install the mounting buttons with the screw hole...

Page 14: ...re true for all vertical models except for the high density models Those units can only mount on its side with outlets facing the back of the rack Reference the high density PDU installation section f...

Page 15: ...ight PDUs with outlets facing in towards center of the rack C Four half height PDUs with outlets facing in towards center of the rack High Density PDU Installation This unique form factor comes in bot...

Page 16: ...AL 15 A B NOTE One full height can be installed per side of rack whereas two half height models per side one on the top and the other on the bottom 1U PDUs Mounting Options This unit can be installed...

Page 17: ...unting Hardware Installation 1U PDU mounting in a U position of the rack 1 Install the cage nuts at the desired U location 2 Screw the mounting bracket ears into the RETMA rail surface at the U locati...

Page 18: ...NE G5 INSTALLATION MANUAL 17 2U PDUs Mounting Options This unit can be installed in any U locations of the rack Mounting Hardware Installation 1 Install cage nuts at the desired U locations 2 Install...

Page 19: ...ounding or bonding of ungrounded metal parts This bonding point can also be used to bond the PDU to a known earthed reference terminal in the building Per international regulatory requirements the pri...

Page 20: ...enough length in the PDU power cord to reach the PDU power source 1 Turn the feed circuit breaker Off 2 Make sure that all circuit breakers on the PDU are set to On 3 Connect each PDU to an appropriat...

Reviews: