PVIQ™ CONNECTIVITY SYSTEM USER MANUAL V 1.0
121
Figure 97: Installing the PM/EM UI
It is important to install the correct Interface Unit on the correct patch panel. The Patch
Panel that houses the Panel Manager requires an IU with an RJ45 interface jack
(provisioning port) located on it. The panels for the Expansion Modules will receive IUs
that
do not
have this Provisioning Port. Refer to the following figures to see the
differences.
Figure 98: Panel Manager Interface Unit (with RJ45 Provisioning Port)
Figure 99: Expansion Module Interface Unit
Installing the Mounting Bracket
The Panel Manager and Expansion Module(s) attach to the back of the Patch Panels
using a Mounting Bracket. Both the PM and EM use the same Mounting Bracket.