V00028CA Rev03
www.panduit.com
Page
2
of
18
Table of Contents
Copper Trunk Cable Installation
Fiber Trunk Cable Installation
Copper Switch A&B Installation.
Fiber Switch A&B Installation.
IDF Unpacking
1.
Unpack the IDF enclosure and remove the miscellaneous carton on top of the IDF enclosure.
Figure 2: Unwrapped enclosure and carton.
2.
Remove the enclosure mounting hardware and Hoffman Protek installation guide from the miscellaneous
carton.