background image

18

High Sign Boards 1/2

YELLO

W

GREY

D

ARK GREEN

PURPLE

ORANGE

LIGHT BLUE

GREEN

PINK

BR

O

WN

BLUE

Disconnect         

     frames

Insert connecting tubes

Attach sign frames

Add remaining frames

Shipping

position

x1

x6

Summary of Contents for h-line

Page 1: ...Assembly instructions MKG_US_setuphlineUSACA_V1_20140926 Also includes ...

Page 2: ...Thank you for choosing ...

Page 3: ...GREEN N PINK N BROWN N BLUE N Identification of the crate 4 Assembly don ts 5 Smart optimized storage 6 Color coding of modules 7 Assembly sequence Example 8 How to connect frames 9 Standard Module 10 Corner Module 10 Storage Module 10 sqft and Closet 11 Storage Module 20 sqft 12 Shelving Module 13 Multimedia Module 14 Arch Module 15 16 Console Module 17 High Sign Boards 18 19 Aisle Sign 20 Counte...

Page 4: ...g rod Shelf support Hanging rod Stepladder Extension cord TV iPad Power strip Trash bin Shelf Counter platform Console platform Counter shelf Shelf Connection tube ACCESSORIES CONNECTOR STORAGE FURNISHINGS LED display light 3 Pull out 1 Remove START box x4 2 Unscrew ...

Page 5: ...5 1 3 4 5 2 1 2 Assembly don ts 3 1 Do not disassemble the frame or remove the graphic Do not place the frame on the ground graphic side down Do not carry horizontal ...

Page 6: ... THE FRAMES Some frames are connected during shipping Corner profile Storage Counter Module High Signboarding Module Console Module Standard module 19 Standard module 38 To disconnect the frames refer to the corresponding modules see contents 19 19 38 9 1 2 ...

Page 7: ...7 Color coding of modules BROWN N ...

Page 8: ...8 1 2 3 4 5 6 11 19 12 20 21 22 15 14 26 8 9 23 24 25 13 17 18 16 7 10 Assembly sequence Example 23 Start here Refer to the rendering created especially for your booth for frame numbering ...

Page 9: ...9 How to connect frames MODULAR SOLUTION 3 1 2 Insert Rotate Lock in place 90 Open completely Connector ...

Page 10: ...10 Corner Module YELLOW N GREY N DARK GREEN N PURPLE N ORANGE N N LIGHT BLUE GREEN N PINK N BROWN N BLUE N x2 x2 Corner profile 1 Identify components 2 Attach the corner profile 3 Connect x1 ...

Page 11: ... N DARK GREEN N PURPLE N ORANGE N N LIGHT BLUE GREEN N PINK N BROWN N BLUE N x1 x4 x4 1 Connect frames 2 Attach door 3 Snap finishing rods into place x2 Always transport with the door locked See storage accessories p 24 Black graphics inside ...

Page 12: ...onnect frames 2 Attach door 3 Snap finishing rods into place x1 YELLOW N DARK GREEN N PURPLE N ORANGE N N LIGHT BLUE GREEN N PINK N BROWN N BLUE N Always transport with the door locked See storage accessories p 24 Black graphics inside ...

Page 13: ...13 Shelving Module DARK GREEN N PURPLE N ORANGE N N LIGHT BLUE GREEN N PINK N BROWN N BLUE N Wood Plexiglas 1 Fold out feet 2 Insert shelf fasteners 3 Install shelves x1 1 2 ...

Page 14: ...N PURPLE N ORANGE N N LIGHT BLUE GREEN N BROWN N BLUE N Anti theft device Padlock placement Right view Left view 1 Fold out feet 2 Attach TV 3 Insert anti theft device x1 Install TV stand before three step if it has not been provided ...

Page 15: ...15 Arch Module 1 2 DARK GREEN N PURPLE N ORANGE N N LIGHT BLUE BROWN N BLUE N 2 m 1 Fold out feet 2 Place frame 2 m away 3 Place canopy on top x2 ...

Page 16: ...16 DARK GREEN N PURPLE N ORANGE N N LIGHT BLUE BROWN N BLUE N Arch Module 2 2 Connects in front of canopy Connects in back of canopy 4 Connect 5 Position arch 6 Snap finishing rods into place x4 ...

Page 17: ...e Module DARK GREEN N ORANGE N N LIGHT BLUE BROWN N BLUE N 6 x3 3 Connect frames 2 Fold out feet 4 Snap finishing rods into place 5 Insert platform Attach platform x1 x2 1 Disconnect frames 1 2 Shipping position ...

Page 18: ...18 High Sign Boards 1 2 ORANGE N N LIGHT BLUE BROWN N BLUE N 1 Disconnect frames 2 Insert connecting tubes 3 Attach sign frames 4 Add remaining frames Shipping position x1 x6 ...

Page 19: ...19 High Sign Boards 2 2 ORANGE N N LIGHT BLUE BROWN N BLUE N 5 Lock in place 6 Position sign 7 Lock in place 8 Snap finishing rods into place x4 x4 x4 ...

Page 20: ...20 Aisle Sign ORANGE N BROWN N BLUE N Slits for graphic No corner profile Two sided graphic Right version Left version Finishing rods see p 23 1 Connect 2 Snap finishing rods into place x1 x2 ...

Page 21: ...21 Counter Module BROWN N BLUE N x4 Shipping position 1 Disconnect 2 Connect at an angle 3 Position shelf 4 Snap finishing rod into place 5 Position platform on top x1 x4 x2 x1 x1 No corner profile ...

Page 22: ...Module Door BROWN N BLUE N x1 x1 Door 1 Disconnect 2 Connect at an angle 5 Snap finishing rod into place 4 Attach door x1 x4 x4 x4 x2 Shipping position No corner profile 3 Position shelf 6 Position platform on top ...

Page 23: ...23 Finishes FEET Closed position of feet during shipping Open and locked position Free standing position FINISHING RODS Snap into place Snaps into place Snaps into place ...

Page 24: ...ELVES Finishes Locate slits on the graphic 1 2 Maximum load 6 61 lbs HANGING ROD High sign board position Hangers included 1 Identify Set in place 1 Install hanging rod 2 Place hangers inside 3 Attach shelf ...

Page 25: ...25 FREE STANDING SHELF Finishes x4 x4 x12 x4 LED DISPLAY LIGHT Assemble 1 2 3 ...

Page 26: ...Require the original This will guarantee that you are in compliance with the fireproofing standards of your country ...

Reviews: