Paradox Marine Technical Support
1 (866) 929-4441
8
Figure 6
3. Bring the Body Moulding down the cable and snap firmly over the
carrier moulding ensuring that the steps on the blue Carrier Housing are aligned
with the apertures in the Body Moulding.
4. Bring the Gland and Collet down the cable and locate in the Body Moulding.
Screw the Clamp Nut onto the body moulding and tighten as close to the
shoulder as possible (Figure 7).
Figure 7