DigiplexNE DGP-NE96
- 49 -
Programming Guide
PCB LAYOUT
PLEASE NOTE:
When powering up the DGP-NE96 control panel (V1.02 or higher), the panel will begin a module
scan to verify if all the modules connected to the panel are operational. The scanning process will
take between 30 and 120 seconds to complete depending on the number of modules connected
to the control panel. The module scan is complete when the LCD keypad begins to show the
partition status. Only after the module scan is complete will the control panel be fully operational.
When installing the bus wires in a noisy environment, or when
connecting the bus across separate buildings, you must use a
shielded cable. Refer to “Connecting The Bus in Noisy
Environments” on page 50.
Refer to the UL and ULC Warnings section of the DigiplexNE Reference &
Installation Manual for UL and ULC warnings.