9128-A2-GB20-80
September 2002
7-1
7
Operation and Maintenance
This chapter includes the following:
Displaying System Information
on page 7-3
Viewing LEDs and Control Leads
on page 7-4
—
FrameSaver SLV 9126 LEDs and Control Leads
—
FrameSaver SLV 9128-II LEDs and Control Leads
—
LED Descriptions
—
Control Lead Descriptions
Device Messages
on page 7-12
Status Information
on page 7-18
—
System and Test Status Messages
—
Network LMI-Reported DLCIs Status
—
IP Path Connection Status
—
PVC Connection Status
—
Time Slot Assignment Status
—
DBM Interface Status
IP Routing Table
on page 7-48
Performance Statistics
on page 7-50
—
Clearing Performance Statistics
—
Service Level Verification Performance Statistics
—
DLCI Performance Statistics
—
Frame Relay Performance Statistics
—
ESF Line Performance Statistics
—
DBM Call Performance Statistics
—
Ethernet Performance Statistics
Summary of Contents for 9126
Page 150: ...4 Configuration Options 4 106 September 2002 9128 A2 GB20 80 ...
Page 182: ...6 Security and Logins 6 16 September 2002 9128 A2 GB20 80 ...
Page 264: ...7 Operation and Maintenance 7 82 September 2002 9128 A2 GB20 80 ...
Page 348: ...A Menu Hierarchy A 4 September 2002 9128 A2 GB20 80 ...
Page 440: ...E Connectors Cables and Pin Assignments E 18 September 2002 9128 A2 GB20 80 ...