Index
IN-4
September 2002
9128-A2-GB20-80
D
Data
Channel Loopback, 4-36, 7-21, 8-32
Delivery Ratio (DDR), 1-10
Inverse ARP for, 1-2
Link Control Identifier (DLCI), 4-79, 4-81
Port
physical options, 4-38
port connector pin assignments, E-11
Rate (Kbps), 4-96
selection criteria, 2-9
uploading SLV and packet capture, 7-80
Date & Time setting, 4-5
DBM
BRI Card Failed, 7-20
call performance statistics, 7-67
changing BRI software, 7-78
configuring interface, 4-45
configuring to send traps, 4-18
connector, E-17
Download Required, 7-21
forcing backup and placing a call, 7-72
Health and Status messages, 7-20
interface status, 7-38
ISDN problems, 8-17
test status messages, 7-27
tests, 8-19
verifying setup, 7-74
DCLB, 8-32
DDR, 1-10
DE
Set, 4-78
Default IP Destination, 4-75
DefaultCodePoints, 4-25
Delete key, 2-6, 2-10
deleting a login, 6-13
designations
ICMP, C-31
TCP port, C-33
UDP port, C-34
Destination, 4-89
based routing, 5-3
Default IP, 4-75
DLCI, 4-69–4-70
EDLCI, 4-70–4-71
Link, 4-69–4-70
Device
messages, 7-12
troubleshooting problems, 8-14
DHCP, 5-11
Relay Agent, 5-13
CLI commands, C-18
configuration example, 5-14
server
at remote site configuration example, 5-13
CLI commands, C-15
with NAT configuration example, 5-12
diagnostic CLI commands, C-23
dial backup, 4-12
dialControl
traps, B-17
dialCtlPeerCall
traps, B-17
Dial-In Access, 4-100
controlling, 6-4
Dial-Out
Delay Time (Min), 4-92
Directory, 4-93
options, 4-6, 4-88
Trap, 4-92
Directory
Alternate Dial-Out, 4-93
disabling
SNMP access, 6-9
system alarm relay, 7-81
disaster recovery, 4-12, 4-19
Discard Eligible (DE), 4-78
Disconnect
modem, 7-71
Time (Minutes), 4-86, 4-98, 4-102
discovering elements/DLCIs, 11-3
Discovery
frame relay (FR), 4-9
Frame Relay Mode
saving a mode change, 4-11
time slot, 1-6
displaying
configuration options, 3-4
identity information, 7-3
LEDs and control leads, 7-4
DLCI, 4-79, 4-81
Alternate, 4-81
assigning to a Backup Group, 4-18
Destination, 4-69–4-70
Down, 7-21, 8-7
on SLV Timeout, 4-29
interface status, 7-30
IP Enabled, 4-65
LMI-reported status, 7-32
monitoring user history, 10-16
Number, 4-64
Summary of Contents for 9126
Page 150: ...4 Configuration Options 4 106 September 2002 9128 A2 GB20 80 ...
Page 182: ...6 Security and Logins 6 16 September 2002 9128 A2 GB20 80 ...
Page 264: ...7 Operation and Maintenance 7 82 September 2002 9128 A2 GB20 80 ...
Page 348: ...A Menu Hierarchy A 4 September 2002 9128 A2 GB20 80 ...
Page 440: ...E Connectors Cables and Pin Assignments E 18 September 2002 9128 A2 GB20 80 ...