background image

2

Available Options

The following options can be ordered separately:

„

72-inch EIA standard cabinet, 19 inches wide

„

Redundant/replacement power supply

„

Power supply fan tray

„

Replacement fan tray for NAMs

„

Replacement baffle

„

RJ48H T1 Mass Termination cable for T1 NAMs

„

FrameSaver 9120 Carrier NAM Upgrade Kit to upgrade a current 1-slot FrameSaver 
9120 NAM for use in the access carrier

„

FrameSaver SLV 9128 1-Slot Housing-to-Access Carrier Upgrade Instructions for 
converting a 1-slot FrameSaver SLV 9128 for use in the access carrier

„

9161 Single T1 NAM Upgrade Kit to upgrade the T1 NAM I/O to the Single T1 NAM 
I/O for use in the access carrier

„

9261 Dual T1 NAM Upgrade Kit to upgrade the 9261 NAM I/O to the Dual T1 NAM 
I/O for use in the access carrier

Contact your sales representative to order an option.

Before You Install the Access Carrier

Make sure you have:

A dedicated, grounded power outlet that is protected by a circuit breaker and 
located within 6 feet of the access carrier

A clean, well-lit, and ventilated site that is free from environmental extremes

One-to-two feet of clearance for cable connections

Strain relief material for cable support

A large Phillips screwdriver to install the access carrier in a cabinet or rack

A small or medium Phillips screwdriver to install the I/O card filler panels and front 
filler panels

A small, flat-blade screwdriver to install the I/O cards, cable connections, and 
redundant power supply (if needed)

Contacted your network provider to coordinate installing the carrier and its 
associated cards into the network

Summary of Contents for 9161 Single T1

Page 1: ...the following Power supply already installed and power cord Power supply fan tray already installed Fan tray for NAMs already installed Baffle for heat deflection including extender brackets for insta...

Page 2: ...de the 9261 NAM I O to the Dual T1 NAM I O for use in the access carrier Contact your sales representative to order an option Before You Install the Access Carrier Make sure you have A dedicated groun...

Page 3: ...ration When performing installation procedures however take proper static control precautions to prevent damage to equipment If you are not sure of the proper static control precautions contact your n...

Page 4: ...Bottom up installation keeps the cabinet from becoming top heavy Install the access carrier into the cabinet rack before installing any cards in the unit Use some type of strain relief to support mult...

Page 5: ...ccess carrier against the front rail of the cabinet allowing the installed machine screws on each side to pass through the keyholes 3 Lower the access carrier into place allowing the keyholes to slide...

Page 6: ...ght side of the carrier Align the hole of the nut with the hole in the rail 2 Place the access carrier against the front rail of the cabinet allowing the installed machine screws to pass through the k...

Page 7: ...er to the instructions that came with the power supply AC Power Supply for 5 Slot Housing and 9000 Series Access Carrier Installation Instructions Document No 9000 A2 GN17 for installation information...

Page 8: ...in circulating air and the green LED lights If not check potential reasons in Troubleshooting in the appropriate product manual Installing the Baffle A baffle with self retaining nuts is provided for...

Page 9: ...3 Using four of the screws provided attach the baffle to the rack immediately below the carrier as shown Baffle 19 Cabinet 23 Cabinet 01 15789 01 Self Retaining Nuts Extender Bracket Self Retaining Nu...

Page 10: ...ed NAMS are installed from the rear NOTE Cards can be added or removed without powering down the unit I O Card Installation The I O card inserts into the rear of the access carrier and directly connec...

Page 11: ...1 Select the proper filler panel size to cover empty slots 2 At the rear of the carrier align the filler panel with the upper and lower tracks of the slot then screw the panel into place using the scr...

Page 12: ...unused NAM slots and captive screws to install them Filler panels provided will cover either four two or one empty NAM slot s Procedure 1 Select the proper filler panel size to cover the empty slots...

Page 13: ...h the installation Procedure 1 Insert the power cord into the I O card s power connector 2 Plug the other end into a power outlet Verification Checklist Did the green power supply LED light Did the gr...

Page 14: ...ysical Environment Operating temperature Storage temperature Relative humidity Shock and vibration 35 F to 122 F 1 7 C to 50 C 4 F to 158 F 20 C to 70 C 5 to 85 noncondensing Withstands normal shippin...

Page 15: ...ersons will walk on the power cord 6 Disconnect power before servicing 7 General purpose cables are provided with this product A UL Listed CSA Certified minimum No 26 AWG telecommunications cable is p...

Page 16: ...imeter in length regardless of the width UNITED STATES EMI NOTICE This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to Part 15 of the FCC rules T...

Page 17: ...ance But if advance notice is not practical you will be notified as soon as possible You will be advised of your right to file a complaint with the FCC Your telephone company may make changes in facil...

Page 18: ...le Identification SPID number and one local phone number Capability Package R for 2B service which supports up to two circuit switched B channels BRI B1 and BRI B2 with two SPID numbers and two local...

Page 19: ...the above conditions may not prevent degradation of service in some situations Repairs to certified equipment should be coordinated by a representative designated by the supplier Any repairs or altera...

Page 20: ...ormation by fax or to speak with a company representative Within the U S A call 1 800 870 2221 Outside the U S A call 1 727 530 2340 Document Feedback We welcome your comments and suggestions about th...

Reviews: