Troubleshooting
9-31
9161-A2-GH30-40
April 1999
The following tests cannot be running when a V.54 test is initiated:
H
A Send Pattern Test, Send Remote Line Loopback, Payload Loopback, or
Repeater Loopback on the interface to which the port is assigned
H
DTE Payload Loopback, Send Pattern Test, or Send FT1 Loopback on the
same port
Remote FT1 Data Channel Loopback
The Remote FT1 Data Channel Loopback commands a remote device to go into
Data Channel Loopback on associated port.
"
Procedure
To send a Remote FT1 Data Channel Loopback:
1. Follow this menu selection sequence:
Main Menu
→
Test
→
Sync Data Port Tests
2. Enter the desired slot and port number.
3. Select the code Up or Down in the Send FT1 Loopback field.
4. Highlight Send under Command in the Send Ft1 Loopback row. Then, press
Enter to start the test. The code will be sent for up to 10 seconds, or until an
acknowledgement is received from the remote end.
5. View the length of time that the test has been running in the Results column.
The following tests cannot be running when a V.54 test is initiated:
H
A Send Pattern Test, Send Remote Line Loopback, Payload Loopback, or
Repeater Loopback on the interface to which the port is assigned
H
DTE Payload Loopback, Send Pattern Test, or Send V.54 Loopback on the
same port
Summary of Contents for 9261
Page 1: ...MODEL 916x 926x T1 ACCESS MUX TECHNICAL REFERENCE Document No 9161 A2 GH30 40 April 1999 ...
Page 34: ...Management and Control 2 6 9161 A2 GH30 40 April 1999 This page intentionally left blank ...
Page 54: ...User Interface 4 10 9161 A2 GH30 40 April 1999 This page intentionally left blank ...
Page 92: ...Setting Up 5 38 9161 A2 GH30 40 April 1999 Example Channel Allocation ...
Page 142: ...Security 6 10 9161 A2 GH30 40 April 1999 This page intentionally left blank ...
Page 252: ...IP Addressing B 8 9161 A2 GH30 40 April 1999 This page intentionally left blank ...