2. Cabling
2-8
April
2002
4821-A2-GN20-00
Chaining Units Together
Up to eight BitStorm 4800 units may be chained together by their UPLINK and
DOWNLINK ports. One unit provides the uplink for the stack.
Procedure
To chain together a group of BitStorm 4800 units:
1. Plug an 8-pin modular cable into the DOWNLINK GigE jack of the
BitStorm 4800 that will provide the uplink.
2. Plug the other end of the cable into the UPLINK GigE jack of the next
BitStorm 4800 in the stack.
3. If there is another BitStorm 4800 below this one in the logical stack, plug an
8-pin modular cable into the DOWNLINK GigE jack of this BitStorm 4800.
4. Repeat
until all units in the stack are cabled together.
In Release 1, all units must have a Management Module installed.
02-17077
OK
ALARM
TEST
1
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
44
46
48
47
2
4
6
8
1
7
MGMT
3
5
3
5
7
11
13
15
17
19
9
21
23
25
27
29
31
33
35
37
39
41
43
45
OK
ALARM
TEST
1
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
44
46
48
47
2
4
6
8
1
7
MGMT
3
5
3
5
7
11
13
15
17
19
9
21
23
25
27
29
31
33
35
37
39
41
43
45
OK
ALARM
TEST
1
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
44
46
48
47
2
4
6
8
1
7
MGMT
CONSOLE
MODEM
ALARM
V.35/X.21
3
5
3
5
7
11
13
15
17
19
9
21
23
25
27
29
31
33
35
37
39
41
43
45
4804
UPLINK
GigE
DOWNLIN
K
GigE
STACK PO
SITION
UPLINK
GigE
DOWNLIN
K
GigE
STACK PO
SITION
UPLINK
GigE
DOWNLIN
K
GigE
STACK PO
SITION