Test Timeout Feature
A Test Timeout feature is available to automatically terminate a test (as opposed
to manually terminating a test) after it has been running a specified period of
time.
It is recommended that this feature be used when the
FrameSaver unit is
remotely managed through an inband data stream (PVC). If a test is accidently
commanded to execute on the interface providing management access, control is
regained when the specified time period expires, automatically terminating the
test.
To use this feature, enable the Test Timeout configuration option, and set a
duration for the test to run in the Test Duration (min) configuration option (see
Configuring General System Options
in Chapter 4,
Configuration Options).
NOTE:
These configuration options do not pertain to tests commanded by the DTE,
like a DTE-initiated External Loopback.
Starting and Stopping a Test
Use this procedure to start, monitor, or abort specific tests. To abort all active
tests on all interfaces, see
Aborting All Tests
.
When the status of a test is . . .
The only command available is . . .
Inactive
Start
Active
Stop
Start or stop an individual test using the same procedure.
Summary of Contents for FrameSaver DSL 9783 CSU/DSU
Page 1: ...FrameSaver DSL 9783 USER S GUIDE Document No 9783 A2 GB20 00 July 2000...
Page 24: ...About the FrameSaver DSL Unit 1 12 9783 A2 GB20 00 July 2000...
Page 134: ...Operation and Maintenance 6 36 9783 A2 GB20 00 July 2000...
Page 182: ...Menu Hierarchy A 4 9783 A2 GB20 00 July 2000 This page intentionally left blank...