background image

 12

9580-A2-GZ40-10

June 1999

Main

Status

Test

System  and

Test Status

Port-1 DLCI

Circuit Details

Port-2 DLCI

Circuit Details

VPI/VCI

Circuit Details

PVC

Connection

Status

*

Performance

Statistics

Display

LEDs

Identify

Interface

Traffic

Network

DS3 Line

Network

ATM

Network

VCC

PVC

Port 1

Physical

Port 1

Frame

Relay

Port 1

DLCI

Port 2

Physical

Port 2

Frame

Relay

Port 2

DLCI

Physical

Tests

Port-1

PVC

Tests

Port-2

PVC

Tests

Network

PVC

Tests

IP

Ping

LED

Tests

VCC

Performance

Monitoring

VCC Loopback

& RTT

Estimation

Abort

All

Tests

98-16034a

*

The PVC Connection Status screen
allows jumps to other screens by use
of virtual function keys. Possible jumps
are shown by dashed lines.

All screen function keys located below the dotted line operate the same way
throughout the ATI screens where they appear. This is a partial list.

For . . .

Select . . .

And press Enter to . . .

Exit

E or e

Terminate the async terminal session.

MainMenu

M or m

Return to the Main Menu screen.

PgDn

D or d

Display the next page, or group of entries.

PgUp

U or u

Display the previous page, or group of entries.

Refresh

R or r

Display current data.

Save

S or s

Save information.

Summary of Contents for FrameSaver SLV 9580 T3 ATM DSU

Page 1: ...t the DSU to an Ethernet interface Connect the DSU to a terminal or PC directly or through a modem Enter a device profile Set up system Login IDs and access levels Configure the system Configure manag...

Page 2: ...e mounted in a standard 19 inch or 23 inch cabinet or open rails and either flush with the mounting rails or approximately 4 inches forward of the rails The different configurations are accommodated b...

Page 3: ...line up precisely with holes in the rail 2 Mark the holes in the rail where the two machine screws will go Then mark the opposite rail in the same positions 3 If the rack has threaded holes go to Step...

Page 4: ...kets to the DSU with four 8 flathead screws Fra meSaverTM SLV 95 80 AI S XM T RC V LC V OO F LO S YE L PO RT 1 TD RD DS R DT R PO RT 2 NE TW OR K TD RD DS R DT R SY ST EM OK AL M TS T PW R FA N 98 160...

Page 5: ...ver SLV 9580 DSU into position in the rack putting the screws through the keyed holes of the bracket Lower the DSU onto the screws 98 16024 8 Put a machine screw through the top hole of each bracket a...

Page 6: ...connector of the power cable into the power receptacle on the back of the FrameSaver SLV 9580 DSU Fix the cable to the rail with a cable tie or other strain relief device 3 Connect the other end of th...

Page 7: ...essage What It Indicates What To Do Bypassed Self test was disabled when the unit was powered up or reset No action needed CPU Fail The CPU failed internal testing 1 Reset the unit and try again 2 Cal...

Page 8: ...the back of the FrameSaver SLV 9580 DSU Turn the cable connector clockwise to lock it 3 Fix the cables to the rail with a cable tie or other strain relief device 4 Connect the receive and transmit cab...

Page 9: ...with the DSU NOTE If you wish to isolate the router from network activity until proper network operation has been verified do not connect the router to the DSU until the network has been configured a...

Page 10: ...t supplied with the FrameSaver SLV 9580 DSU Procedure To connect the FrameSaver SLV 9580 DSU to an Ethernet hub or NIC 1 Select the correct cable To connect the LAN port to a hub use a standard 10Base...

Page 11: ...connector of the cable onto the TERMINAL PORT socket on the back of the FrameSaver SLV 9580 DSU If the cable will be permanently attached fasten the connector and fix the cable to the rail with a cab...

Page 12: ...Performance Monitoring VCC Loopback RTT Estimation Abort All Tests 98 16034a The PVC Connection Status screen allows jumps to other screens by use of virtual function keys Possible jumps are shown by...

Page 13: ...s PVC Connection Entry Service Level Verification Entry to all of the FrameSaver SLV 9580 DSU s tasks begins at the Main Menu screen which has these menus or branches Select To Status View system stat...

Page 14: ...I Supporting ILMI Date Time Procedure To set the Device Profile 1 Follow this menu selection sequence Main Menu Control Device Profile main control device_name PARADYNE 9580 Device Name Node A 05 13 2...

Page 15: ...o configuration should not be run until you have used the Configure branch to set up any specific management PVCs required for your network Accessing and Displaying Configuration Options To display th...

Page 16: ...PVC Connections Test User Interfaces Management and Communication Ctrl a to access these functions ESC for previous menu MainMenu Exit Save 3 Select the options you would like to configure Select To c...

Page 17: ...management a corresponding DLCI for Port 1 and a management DLCI are created and connected for every VPI VCI discovered H 2MPorts An IWF DLCI containing three EDLCIs one for each port and one for mana...

Page 18: ...2 Network PVC Tests Start and stop a PVC test in the direction of the network IP Ping Display the menu for running the PING function LED Test Perform a lamp test VCC Performance Monitoring Select Virt...

Reviews: