1. Installation
4200-A2-GN20-10
October 2002
1-9
3. Insert and tighten the screws in the top screw positions, then tighten the
bottom screws.
4. Do not plug in the unit. Proceed to
Installing the Uplink Module
on page 1-13.
23-inch (584 mm) Nortel
Rack Mount
1
12
13
24
DSL PORTS 1-2
4
POTS 1-24
4
8
16
20
POWER
A
ALARM
RTN -48VDC
BITS
MGMT
CONSOLE
ST
AT
US
UP
LI
NK
AL
RM
TE
ST
B
A
3.5 A 60
B
E1 MODULE
4202
TX
RX
100/120
W
75
W
1
12
13
24
DSL PORTS 1-24
POTS 1-24
4210
4
8
16
20
POWER
A
ALARM
RTN -48VDC
BITS
MGMT
CONSOLE
ST
AT
US
UP
LI
NK
AL
RM
TE
ST
B
A
3.5 A 60
B
T1/E1 MODULE
4201
TX
RX
100/120
W
75
W
Summary of Contents for GranDSLAM 4200
Page 1: ...GranDSLAM 4200 ATM Stackable DSLAM Installation Guide Document No 4200 A2 GN20 10 October 2002...
Page 6: ...E October 2002 4200 A2 GN20 10...
Page 42: ...2 Cabling 2 18 October 2002 4200 A2 GN20 10...
Page 50: ...4 Configuration 4 6 October 2002 4200 A2 GN20 10...
Page 58: ...A Connectors and Pin Assignments A 8 October 2002 4200 A2 GN20 10...