About the Model 7976 Standalone Termination Unit
1-3
7976-A2-GB20-10
August 1998
Network Configuration
Figure 1-1
shows several configurations including a network application using a
4-port Hotwire 8776 M/SDSL Termination Unit in a central office (CO). In this
configuration, a frame relay switch and a router are connected, through the
termination unit, to partner units supporting a host or router, and frame relay
encapsulated or unframed data.
This figure also shows a standalone-to-standalone configuration using either
another Hotwire 7976 M/SDSL standalone unit with a G.703 interface or a
Hotwire 7975 M/SDSL standalone unit with an EIA-530A interface.
Frame
Relay
Switch
Router
E1 Host
(Frame Relay
Encapsulated
Data)
98-16093
Router
(Frame Relay
Encapsulated
Data)
G.703
G.703
Router
2.048 Mb
over
SDSL
G.703
G.703
G.703
8776 Termination Unit
in 8600 DSLAM
CO Site
7976
7976
7976
Customer
Premises (CP)
7976
7976
CP
NTU
CO Site
LTU
G.703
G.703
G.703
7976
7975
CP
NTU
CO Site
LTU
G.703
EIA 530A
Figure 1-1.
Sample M/SDSL Configurations
Summary of Contents for Hotwire 7976
Page 56: ...Monitoring the Unit 4 14 7976 A2 GB20 10 August 1998 This page intentionally left blank...
Page 66: ...Testing 5 10 7976 A2 GB20 10 August 1998 This page intentionally left blank...
Page 78: ...Security 7 6 7976 A2 GB20 10 August 1998 This page intentionally left blank...
Page 104: ...Standards Compliance for SNMP Traps B 6 7976 A2 GB20 10 August 1998...
Page 112: ...Technical Specifications D 2 7976 A2 GB20 10 August 1998...