Monitoring the Unit
4-6
7976-A2-GB20-10
August 1998
Test Status
The Test Status messages in the following table appear in the right column of the
System and Test Status screen.
Table 4-3.
Test Status Messages
Test Status Message
Meaning
No Test Active
No tests are currently running.
LLB Test Active, Pt 1
A network Line Loopback test is active on Port 1.
PLB Test Active, Pt 1
A Payload Loopback test is active on Port 1.
DLB Test Active, Pt 1
A Data Terminal Loopback test is active on Port 1.
RLB Test Active, Pt 1
A Repeater Loopback test is active on Port 1.
511 Test Active, Pt 1
A 511 Test and Monitor is active on the DSL Port 1 network
interface.
Lamp Test Active
The Lamp Test is active, causing the LEDs on the front panel to
light.
For further information on testing, refer to Chapter 5,
Testing
.
Summary of Contents for Hotwire 7976
Page 56: ...Monitoring the Unit 4 14 7976 A2 GB20 10 August 1998 This page intentionally left blank...
Page 66: ...Testing 5 10 7976 A2 GB20 10 August 1998 This page intentionally left blank...
Page 78: ...Security 7 6 7976 A2 GB20 10 August 1998 This page intentionally left blank...
Page 104: ...Standards Compliance for SNMP Traps B 6 7976 A2 GB20 10 August 1998...
Page 112: ...Technical Specifications D 2 7976 A2 GB20 10 August 1998...