Configuration Option Tables
A-6
7976-A2-GB20-10
August 1998
System Options Menu
For System Options, refer to Table A-3. To access the System Options screen,
follow this menu selection sequence:
Main Menu
→
Configuration
→
Load Configuration From
→
System
Î
Î
ÎÎ
ÎÎ
main/config/system
Hotwire
Model: 7976
SYSTEM OPTIONS
DSL Mode:
NTU
Test Timeout:
Enable
Test Duration (min):
10
G.703 Line Termination
120 Ohm
––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
Ctrl-a to access these functions, ESC for previous menu
MainMenu
Exit
Save
Table A-3.
System Options (1 of 2)
DSL Mode
Possible Settings: LTU, NTU
Default Setting: NTU
Controls whether the unit is configured as a control unit or tributary unit.
LTU – The unit is configured as a control unit (Line Termination Unit).
NTU – The unit is configured as a tributary unit (Network Termination Unit). This unit will
request its IP address from the LTU during establishment of the PPP link.
NOTE:
Changing this option will reset the card.
Test Timeout
Possible Settings: Enable, Disable
Default Setting: Enable
Allows tests to end automatically. The feature should be enabled when the unit is
remotely managed, so that control can be regained after a test is accidentally executed.
Enable – Loopback and pattern tests end when test duration is reached.
Disable – Tests run until manually terminated from the Network Tests screen or
remotely (network initiated tests). Refer to
Running Network Tests
in Chapter 5,
Testing.
Summary of Contents for Hotwire 7976
Page 56: ...Monitoring the Unit 4 14 7976 A2 GB20 10 August 1998 This page intentionally left blank...
Page 66: ...Testing 5 10 7976 A2 GB20 10 August 1998 This page intentionally left blank...
Page 78: ...Security 7 6 7976 A2 GB20 10 August 1998 This page intentionally left blank...
Page 104: ...Standards Compliance for SNMP Traps B 6 7976 A2 GB20 10 August 1998...
Page 112: ...Technical Specifications D 2 7976 A2 GB20 10 August 1998...