A. Configuration Options
7990-A2-GB20-20
September 2004
A-25
Communication Port Subnet Mask
Possible Settings:
000.000.000.000
–
255.255.255.255, Clear
Default Setting:
000.000.000.000
Specifies the unit’s Communication Port Subnet Mask when the unit is configured as a
network communication link.
Communication Port Subnet Mask is used only when Port Use is set to Net Link
(see
Table A-7, Communication Port Options
). If the COM Port IP address is not set
(000.000.000.000), the node IP Address and subnet mask are used.
000.000.000.000
–
255.255.255.255
– Enter an address for the Communication Port
Subnet Mask.
Clear
– Clears the mask to all zeros.
Communication Port Link Protocol
Possible Settings:
PPP
,
SLIP
Default Setting:
PPP
Specifies the unit’s Communication Port link layer protocol when the unit is configured as
a network communication link.
Communication Port Link Protocol is used only when Port Use is set to NetLink (see
Table A-7, Communication Port Options
).
PPP
– Defines Point-to-Point protocol for the link layer protocol for the network
communication link.
SLIP
– Serial Line IP Protocol for the link layer protocol for the network communication
link.
Table A-9.
Communication Protocol Options (2 of 2)
Summary of Contents for Hotwire 7995
Page 16: ...1 About the TDM SHDSL Endpoint 1 8 September 2004 7990 A2 GB20 20...
Page 42: ...3 Initial Startup and Configuration 3 18 September 2004 7990 A2 GB20 20...
Page 48: ...4 Configuring the Unit Using the Internal Switches 4 6 September 2004 7990 A2 GB20 20...
Page 91: ...7 Testing 7990 A2 GB20 20 September 2004 7 15...
Page 92: ...7 Testing 7 16 September 2004 7990 A2 GB20 20...
Page 132: ...B Standards Compliance for SNMP Traps B 8 September 2004 7990 A2 GB20 20...
Page 146: ...C Connectors Cables and Pin Assignments C 14 September 2004 7990 A2 GB20 20...
Page 148: ...D Technical Specifications D 2 September 2004 7990 A2 GB20 20...