6. Monitoring and Troubleshooting
6-4
September 2004
7990-A2-GB20-20
EER at G.703
An EER (Excessive Error
Rate) condition has been
detected on the G.703
interface.
1. Verify the attached
equipment coding is
compatible.
2. Verify your clock
configuration.
3. Contact network provider.
LOF at G.703
An LOF (Loss Of Frame)
condition has been detected
on the G.703 interface.
1. Verify that the network cable
is securely attached at both
ends.
2. Verify the unit’s line framing
and line coding are
compatible with the attached
equipment.
3. Contact network provider.
LOS at G.703
A LOS (Loss Of Signal)
condition has been detected
on the G.703 interface.
1. Verify that the network cable
is securely attached at both
ends.
2. Contact network provider.
LOS at DSL
An LOS (Loss Of Signal)
condition has been detected
on the DSL port when the
DSL transceiver is not in
Data mode.
1. Verify that the network cable
is securely attached at both
ends.
2. Verify proper STU-C and
STU-R configuration.
3. Contact network provider.
Net Com Link Down
The Network communication
link is down.
Communications between
the management system and
the unit is not possible.
1. Verify that the network cable
is securely attached at both
ends.
2. Verify the link protocol for the
COM port is configured
correctly.
3. Verify that no tests are
active.
Primary Clock Failed
A failure has occurred in the
primary clock source for the
G.703 port. Timing is being
supplied by the internal clock.
1. Verify that the network cable
is securely attached at both
ends.
2. Verify the clock configuration
of the unit and the attached
equipment.
3. Contact network provider.
RAI (Remote Alarm
Indication) at G.703
A Remote Alarm Indication
signal is being received by
the G.703 interface.
1. Verify that the units line
framing and line coding are
compatible with the attached
equipment.
2. Contact network provider.
Table 6-1.
Health and Status Messages (2 of 3)
Message
What Message Indicates
What To Do
Summary of Contents for Hotwire 7995
Page 16: ...1 About the TDM SHDSL Endpoint 1 8 September 2004 7990 A2 GB20 20...
Page 42: ...3 Initial Startup and Configuration 3 18 September 2004 7990 A2 GB20 20...
Page 48: ...4 Configuring the Unit Using the Internal Switches 4 6 September 2004 7990 A2 GB20 20...
Page 91: ...7 Testing 7990 A2 GB20 20 September 2004 7 15...
Page 92: ...7 Testing 7 16 September 2004 7990 A2 GB20 20...
Page 132: ...B Standards Compliance for SNMP Traps B 8 September 2004 7990 A2 GB20 20...
Page 146: ...C Connectors Cables and Pin Assignments C 14 September 2004 7990 A2 GB20 20...
Page 148: ...D Technical Specifications D 2 September 2004 7990 A2 GB20 20...