7990-A2-GB20-20
September 2004
7-1
7
Testing
Accessing the Test Menu
From the Test menu, you can run the following tests:
DSL tests to start and stop tests on the DSL interface (Model 7995 only)
DSL & G.703 tests to start and stop tests on the DSL and G.703 interface
(Model 7996 only)
Sync data port tests to start and stop tests on the Sync port interface
(Model 7995 only)
Send and monitor 511 pattern tests
Device tests to start and stop the lamp test
You can also use the Test menu to abort all tests.
To access the Test menu, follow this menu selection sequence:
Main Menu
→
Test
main/test
Model: 799x
TEST
DSL Tests
(Model 7995)
DSL & G.703 Tests
(Model 7996)
SYNC Data Port Tests
(Model 7995)
Device Tests
Abort All Tests
--------------------------------------------------------------------------------
Ctrl-a to access these functions, ESC for previous menu MainMenu Exit
Summary of Contents for Hotwire 7995
Page 16: ...1 About the TDM SHDSL Endpoint 1 8 September 2004 7990 A2 GB20 20...
Page 42: ...3 Initial Startup and Configuration 3 18 September 2004 7990 A2 GB20 20...
Page 48: ...4 Configuring the Unit Using the Internal Switches 4 6 September 2004 7990 A2 GB20 20...
Page 91: ...7 Testing 7990 A2 GB20 20 September 2004 7 15...
Page 92: ...7 Testing 7 16 September 2004 7990 A2 GB20 20...
Page 132: ...B Standards Compliance for SNMP Traps B 8 September 2004 7990 A2 GB20 20...
Page 146: ...C Connectors Cables and Pin Assignments C 14 September 2004 7990 A2 GB20 20...
Page 148: ...D Technical Specifications D 2 September 2004 7990 A2 GB20 20...