V e r i f i c a t i o n
8-1
C
H A P T E R
C
HAPTER
8
V
ERIFICATION
This chapter describes how to verify that the JetFusion IAD operates properly
after installation. It also covers maintenance and how to display the current
configuration. Before you can test the voice capabilities of the JetFusion IAD,
you must first provision it at the voice gateway and configure the voice
application and parameters as described beginning on page 4-35.
Power-up Test
The JetFusion IAD displays an indication of normal operation when you first
power it up. When you power it up, verify that the POWER indicator on the
front panel lights green.
Operational Test
Follow the procedure below to verify that the IAD is operating properly after
installation. This procedure assumes that
•
You have configured Directory numbers (DNs) in the Class 5 switch for the
associated Voice Ports.
•
The IAD has been connected to a terminal emulator via the console port,
displays the normal boot sequence and you can log in.
•
You have configured PVCs at the DSLAM (default data = 0, 38; default
voice is 0, 39) when using ATM.
•
You have provisioned a data network.
•
You connected and configured a WAN link at the associated DSLAM or
voice gateway. For more information, see
WAN Configuration
on page 4-2.
•
You have a PC with Telnet, and an Ethernet adapter running TCP/IP. For
more information, see
Connecting via Telnet
on page 2-9.
•
For testing, you and a counterpart logged on to the upstream voice gateway
can communicate via telephone or cell phone.
Summary of Contents for JetFusion 2004
Page 12: ...viii 2 0 0 0 A 2 G B 2 2 0 0...
Page 20: ...1 6 2 0 0 0 A 2 G B 2 2 0 0...
Page 174: ...6 12 2 0 0 0 A 2 G B 2 2 0 0...
Page 184: ...8 4 2 0 0 0 A 2 G B 2 2 0 0...
Page 186: ...A 2 2 0 0 0 A 2 G B 2 2 0 0...
Page 187: ...M e n u M a p A 3...
Page 188: ...A 4 2 0 0 0 A 2 G B 2 2 0 0...