Pre-Operation Checks
• Ensure hydraulic motor mating surfaces are clean and free from debris
• Check hydraulic motor rotation.(Fig. 1)
• All hydraulic hoses are installed according to manufacturer specifications and supported
properly.
• G125 Pump mounting feet are flat against the mounting surface.
•
Ensure the Relief Valve is closest to the discharge port for protected operation.
NOTE: While in reverse operation, the discharge circuit will be unprotected, possible over-
pressurization can occur.
• G125 relief valve is adjusted appropriately (100 psi from factory, +/- ~5 psi per full turn).
• All piping is securely mounted and supported.
• Check to ensure the pump will turn.
NOTE: The G125 pump must be rotated at least once a week for 3 seconds, use of a lubricating
oil (WD-40) is recommended if the pump is not going to be put in use.
PUMP
OUTLET
PUMP
INLET
G125
(Front View)
G125
(Rear View)
Fig. 3
(LH Rotation shown above)
Summary of Contents for G Series
Page 2: ...Congratulations on your new Paragon purchase...
Page 16: ......