16
LT5245 (2:02/09)
Paragon Symphony CF
Installation Instructions
SECTION TEN
Checking Operation of Fire
CHECKING GAS SOUNDNESS
•
Turn on the gas supply to the appliance and check for soundness in accordance with current
codes of practice.
•
Turn off the gas supply at the external Isolation valve.
•
Remove the pressure test point screw from the inlet elbow and connect the pressure gauge.
•
Turn on the gas to the appliance at the Isolation valve.
•
Light the appliance as described in section 2.
•
Check the inlet pressure is 20mbar. +/- 1.0.
•
Turn off gas supply, at the isolation valve. Disconnect the pressure gauge and replace the
pressure test point screw.
•
Turn on the supply to the appliance and check the pressure test point for soundness with
detection fluid.
LAY FUEL BED
Important: -
Refer to the ‘Heath & Safety Notice located on page 3 of this booklet before laying or replacing any
refractory material.
In the event of replacing fuel bed components please use only the specified number of components
as illustrated. Only use fuel bed component provided for this appliance. In the interest of safety and
efficiency of your appliance when replacing the fuel bed it is essential that the existing fuel bed be
removed and the new components are replaced correctly as a complete set.
Lay fuel bed as described under Users Section.
Warning:
It is important that the fuel bed components are positioned as shown in these instructions.
If the fuel bed components are not positioned correctly this may result in damage to the glass.
REFIT GLASS PANEL
•
Refit glass panel. Prior to replacing the glass panel it may necessary to adjust the seal around the
glass to ensure it is not seen when the decorative trim or fascia is fitted.
CHECKING FOR COMBUSTION PRODUCTS CLEARENCE
IMPORTANT
:-The smoke test must be
carried out with the fire starting from
cold.
•
Light the fire and leave at maximum
input.
•
Close all the doors and windows.
•
After five minutes fit the smoke
match in a holder and position as
illustrated with the head of the
match just inside the test opening.
•
Run the match along the top edge
All smoke
must be drawn into the
test opening if the clearance is
satisfactory.
•
If spillage occurs wait a further five
minutes and repeat the test.
Summary of Contents for SYMPHONY CF
Page 23: ...23 LT5245 2 02 09 ...