10
R
UBBER
F
OOT
I
NSTALLATION
1. Unpack the bag (usually attached to the
machine frame) that contains the rubber
feet for the base of the machine. There
are two different sizes, the elongated oval
fits the upright tubes while the wider oval
fits on the machine mainframe.
2. To install the rubber feet, tilt the machine
to one side by pushing on the upright or
mainframe.
3. Place a rubber foot onto each of the
machines floor contact points.
W
EIGHT
S
TACK
I
NSTALLATION
1. Weight plates are packaged (4) per box and are marked with the quantity and weight of the
plates. The various configurations are shown below.
Standard
170 LB.
(16) x 10lb. plates
4 boxes of B1602
Optional
250 LB.
(16) x 15lb. plates
4 boxes of B1603
Optional
310 LB.
(20) x 15lb. plates
5 boxes of B1603
Standard
210 LB.
(20) x 10lb. plates
5 boxes of B1602
Standard
130 LB.
(12) x 10lb. plates
3 boxes of B1602
Optional
190 LB.
(12) x 15lb. plates
3 boxes of B1603
15 LB. Weight Plate Box
Part Number: B1603
Comprised of
(4) x 15 lb. Weight Plates
10 LB. Weight Plate Box
Part Number: B1602
Comprised of
(4) x 10 lb. Weight Plates
I
NSTALLATION
A
ND
A
SSEMBLY
Weight Stack Configurations
Summary of Contents for XL2 Series
Page 1: ...XL2 INSTALLATION ASSEMBLY MANUAL AM XL2 REV 012813...
Page 19: ......