background image

I179EN - 1021 

 

10/16 

PARATRONIC - Rue des Genêts - Zone Industrielle - 01600 REYRIEUX - FRANCE 

Tel.: +33 (0)4 74 00 12 70 – Fax: +33 (0)4 74 00 02 42 - E-Mail: info@paratronic.fr - Web: 

http://www.paratronic.com

 

 

6.4  MOUNTING THE PROBE CABLE SAFETY COUPLING LUG ON THE LHC: 

 
Unfasten the lug mounting screw using a 3mm hex key: 
 

 

 
 
Fit the coupling lug and refasten the mounting screw: 
 

 

 
 
 

6.5  CONNECTING THE SFP PROBE TO THE LH (C/M): 

 
Insert the SFP probe connector into the socket of the LH(C/M): 
 

 

 

 

Summary of Contents for LHC

Page 1: ...RONIC Rue des Gen ts Zone Industrielle 01600 REYRIEUX FRANCE Tel 33 0 4 74 00 12 70 Fax 33 0 4 74 00 02 42 E Mail info paratronic fr Web http www paratronic com LHC and LHM LEVEL AND TEMPERATURE SENSO...

Page 2: ...der module 6 5 2 Antennas 6 5 3 Sensor 7 6 INSTALLATION 7 6 1 Precautions for installation and use 7 6 2 Connecting the whip antenna to the LHC 8 6 3 Installing the pad antenna and connecting it to th...

Page 3: ...d by customers End users to our company s head office at the following address PARATRONIC Service DEEE Zone Industrielle Rue des Gen ts 01600 REYRIEUX France WARNING The protection offered may be comp...

Page 4: ...nts Power supply 6 0V 12 5Ah lithium battery replaceable by the user Battery life 10 years 1 measurement hour 1 transmission week PC connection Micro USB connector Antenna connection TNC connector LHC...

Page 5: ...B EN 61010 1 EN 62479 EN 50581 Protection rating IP68 permanent duration Body dimensions diam 21 5mm Length 116mm Weight 150g 60g per metre of cable Probe body material 316L stainless steel Cable 7mm...

Page 6: ...REYRIEUX FRANCE Tel 33 0 4 74 00 12 70 Fax 33 0 4 74 00 02 42 E Mail info paratronic fr Web http www paratronic com 5 DIMENSIONS 5 1 LHC OR LHM RECORDER MODULE 403 301 50 79 17 5 2 ANTENNAS Whip 66mm...

Page 7: ...are measuring instruments Therefore they must be handled with caution and care All transportation must be carried out in the original packaging Products must not receive shocks and must not be subject...

Page 8: ...TENNA TO THE LHC Position the whip antenna opposite the metallic connector of the LHC Fasten the antenna onto the connector using the ring provided for this purpose 6 3 INSTALLING THE PAD ANTENNA AND...

Page 9: ...el 33 0 4 74 00 12 70 Fax 33 0 4 74 00 02 42 E Mail info paratronic fr Web http www paratronic com Fasten the antenna mounting component Position the pad antenna connector opposite the metallic connec...

Page 10: ...42 E Mail info paratronic fr Web http www paratronic com 6 4 MOUNTING THE PROBE CABLE SAFETY COUPLING LUG ON THE LHC Unfasten the lug mounting screw using a 3mm hex key Fit the coupling lug and refas...

Page 11: ...card needs to be activated as a general rule via the customer account calling the hotline or other 2 Unlock the PIN Insert the SIM card in a phone and unlock the PIN this will prevent the PIN from be...

Page 12: ...e the 2 parts of the LHC pulling on the suspension cable to gain access to the SIM card holder Insert the SIM card into the slot until it is locked in place Before closing the LHC again check the stat...

Page 13: ...fr Web http www paratronic com 6 7 REPLACING THE LH C M BATTERY Use only Paratronic batteries with the reference LH_PILE Unfasten the 4 screws on the top of the LH C M using a 3mm hex key Slide the 2...

Page 14: ...Remove the used battery Fit the new battery Paratronic reference LH_PILE Reattach the 2 Velcro battery mounting straps and reconnect the battery Before closing the LH C M again check the status of th...

Page 15: ...efer to the IHM_Capteurs software manual I158F for the connection and configuration procedure 6 9 REPLACING THE DESICCANT SACHET SILICA GEL TO PROTECT AGAINST MOISTURE When the ochre granules in the s...

Page 16: ...C M diam 50mm is then inserted into the drilling hole The LH C M head diam 79mm then rests on the edge of the tube Suspended on the suspension cable supplied as standard Using the bracket option ref L...

Reviews: