(2) 20-057 T-Nuts
(1) 18-808 End Cap
(1) 21-005 Base Plate
(1) 21-310 Caster
(1) 24-707-10 Lock Washer
(1) 24-120-10 BHCS
(2) 24-114-8 BHCS
Assembly Instructions
70-134-xx & 70-146-xx
Vertical Lean Board
Tracking & Communication Kits
Contact Information:
Parker Hannifin Corporation
Electromechanical Automation Division
email ipsorders@parker.com
www.parker.com/ips
Two Locations to Serve You:
135 Quadral Drive
Wadsworth, OH 44281
Phone 800.333.4932
Fax 330.334.2350
5500 Business Park Drive
Rohnert Park, CA 94928
Phone 800.358.9070
Fax 707.584.8029
Recommendations:
Time to assemble:
1-2 hours
Assembly area:
10’ x 10’ or larger open floor space.
To prevent scratching, use cardboard or other protective
underlayment.
Required Tools:
• 4 mm hex wrench
• 5 mm hex wrench
• 6 mm hex wrench (ball end)
• Phillips screwdriver
• Flat head screwdriver
• Rubber mallet
Size (ft)
H x W
Display Board Material
Kit
Part Number
3 x 4
White Magnetic
70-134-WK
Black Push Pin
70-134-PK
No Board
70-134-NK
4 x 6
White Magnetic
70-146-WK
Black Push Pin
70-146-PK
No Board
70-146-NK
70-134-xx with
3’ x 4’ display board
70-146-xx with
4’ x 6’ display board
Part Number: 70-101