background image

 
 

 

4087 Walden Avenue 

Lancaster, NY 14086 

 

(716) 685-4040 

f(716) 685-1010 

www.airtek.com 

11)

 

Press button 4, inp 2 appears, press button 4,  and it should read 20.0 

12)

 

Press button 4, dspl 2 appears, press button 4, using buttons 2, & 3 will change the number 
and position change display until it reads 68.0. 

13)

 

Press button 4 to finish and save, if the probe is attached the display will change to a reading 
and after approximately 10 seconds flash to real dew point. If the probe is not attached it 
should flash -199.9. 

 
 

If display continues to read -199.9 the following are possibilities:  
 
 

Input selected in setup menu 

 

TC/RTD switch position. (Dip switch on back of module) 

 

Corresponding signal at signal connector 

 
 
 
 
 
 

6. 

Probe Recalibration 

Routine maintenance of the DB1000 probe / transmitter is confined to regular 
re-calibrations.  This work can only be done by exposure of the moisture 
sensor to sample gases of known moisture content.  The manufacturer of the 
probe provides calibration services traceable to NIST.  Contact Airtek for 
further details. 

 

7. 

Warranty 

The DB1000 is equipped with a 1-year parts and labor warranty.  The DB1000 
is guaranteed to be free from defects in material and workmanship for a period 
of 1-year from date of shipment.  This warranty does not include recalibration 
of probe or meter.  For the warranty to be valid, the customer must call our 
service dept. and speak with a service representative.  No warranty claims will 
be honored without first speaking with an Airtek customer service 
representative.

 

 

Summary of Contents for Airtek DB1000

Page 1: ...1 4087 Walden Avenue Lancaster NY 14086 716 685 4040 f 716 685 1010 www airtek com Airtek DB1000 Instruction and Programming Manual Portable Dew Point Monitor...

Page 2: ...stallation 2 1 Depressurization 2 2 Sample Air Line Installation 2 3 Probe Installation 2 4 Diagram 3 Monitor Installation Placement Probe Cable Connection 4 Operation 4 1 Connect power 4 2 Open Ball...

Page 3: ...itter 2 Mechanical Installation 2 1 Depressurization Prior to installation be sure to safely depressurize the air system in accordance with OSHA practices and principles so installation is done in a s...

Page 4: ...t is to be read Because a 10 cord has been provided the monitor must be within 10 of the probe transmitter 3 2 Probe Cable Connection A 10 cord is provided for connection between the probe transmitter...

Page 5: ...and no need to ever open the case 5 2 Menu Structure To simplify programming the monitors setup functions are divided into two menus A main menu handles all the basic setup functions An advanced feat...

Page 6: ...eing the menu and going right from there Button 2 reset Button 3 max Button 4 ack 1 Energize display If possible leave probe detached 2 Press button 1 should read SETUP 3 Press button 4 until dd dd ap...

Page 7: ...le Corresponding signal at signal connector 6 Probe Recalibration Routine maintenance of the DB1000 probe transmitter is confined to regular re calibrations This work can only be done by exposure of t...

Page 8: ...8 4087 Walden Avenue Lancaster NY 14086 716 685 4040 f 716 685 1010 www airtek com...

Reviews: