PRE-INSTALLATION NOTES
2.1
PRECAUTIONS
Reverse Osmosis (RO) System storage prior to uncrating:
CAUTION
DO NOT
store in direct sunlight.
DO NOT
store above 103 degrees F (39 degrees C).
DO NOT
freeze.
CAUTION
If the RO system has been shipped new with Reverse Osmosis Membrane Elements installed,
the System must be commissioned within 3 months. This is to avoid drying out or biological
fouling of the RO membranes.
2.2
RO SYSTEM LOCATION
The RO unit should be installed in a dry, sheltered location protected from direct weather.
Some type of drainage should be provided beneath the RO unit to allow standing water to
drain when performing maintenance or repair.
The following two diagrams that show the RO System located relative to the seawater level. The
first shows the RO System installation below water line and the second shows the RO System
installation above water line.
Figure 2.1
–
RO Below Water Line
Summary of Contents for AQUA DUO A455C-2800
Page 15: ...15 Figure 2 4 Piping and Instrumentation Diagram 2800 3600 GPD ...
Page 17: ...17 Figure 2 6 Piping and Instrumentation Diagram 4800 6200 GPD ...
Page 32: ...32 Figure 2 26 Hose Tube Connection Instructions Figure 2 27 Tubing Fitting Internals ...
Page 63: ...63 8 DRAWINGS DIAGRAMS ...
Page 64: ...64 1 P ID ...
Page 65: ...65 ...
Page 66: ...66 ...
Page 67: ...67 ...
Page 68: ...68 2 GA Drawing ...
Page 69: ...69 ...
Page 70: ...70 ...
Page 71: ...71 ...
Page 72: ...72 ...
Page 73: ...73 ...
Page 76: ...76 4 Wiring Diagrams ...
Page 77: ...77 ...
Page 78: ...78 ...
Page 79: ...79 ...
Page 80: ...80 ...
Page 81: ...81 ...
Page 82: ...82 ...