HY10-1632-M2.1/US
Parker Hannifin Corporation
Accumulator & Cooler Division
United States
Installation & Disassembly
Bladder Accumulators
6
Assembly & Disassembly
Bladder Assembly in Bottom Repairable
Accumulators
Figure 8
: After shell (Item 1) has been cleaned and
inspected, place accumulator shell in vise or on table.
Spray the inside of the accumulator shell with a liberal
amount of clean system hydraulic fluid to lubricate and
cushion the bladder (Item 2). Make sure the entire inside
of the shell is lubricated.
Figure 9:
Insert the bladder pull rod, 085109xxxx,
through both the shell’s valve stem opening and fluid
port opening. Attach the bladder pull rod to the bladder
valve stem (Item 26).
Figure 10:
With all gas completely exhausted from
bladder (Item 2), collapse bladder and fold longitudinally
in a compact roll. With one hand, pull the bladder pull
rod while feeding the bladder (Item 2) into the shell
(Item 1) with the other hand. Slight twisting of bladder
will assist in this insertion.
Figure 8
Figure 9
Figure 10