8
INSTALLING YOUR
CRYSTAL-AIRE
®
uv
CLEANING SYSTEM
Inspection
Upon receipt of your unit, check for any shipping damage.
A damaged carton indicates that the equipment may have
received rough handling during shipping that may have caused
possible internal damage. Notify your delivery carrier immedi-
ately and enter a claim if any damage is found.
Unpacking
When unpacking the unit, always inspect the CRYSTAL-
AIRE
®
uv components for damage. Before operating unit
remove all packing material such as cardboard and any pack-
aging material that protects the unit during shipment.
UNIT MAY TIP WHEN REMOVING FROM PALLET
UNIT IS HEAVY. USE CAUTION WHEN REMOVING
FROM PALLET
DO NOT DROP UNIT FROM PALLET TO FLOOR
AS DAMAGE TO UNIT MAY OCCUR
Installation
The CRYSTAL-AIRE
®
uv product is available where it can be
located or installed in (4) variations including;
1) Mobile/floor mount,
2) Wall mount using included wall bracket for ambient
3) Ceiling mount above ceiling panels and connected
to ducting (ducting not included).
4) Hanging mount for ambient
Mobile/Floor Mounting:
Open the access panel to expose the pre-filter, UV lamp and
main filter. Inspect these elements to ensure they are properly
installed and correctly positioned and locked into place.
Use assistance when lifting. Cabinet must always be
supported from beneath until the unit has been secured.
The CRYSTAL-AIRE
®
uv should not be used for support
of personnel or material.
CRYSTAL-AIRE
®
uv systems may be installed by suspension
from ceiling joists or other overhead supports. Threaded rod or
eyebolts and chain may be used to hang the unit.
FALL HAZARD
Check the CRYSTAL-AIRE
®
uv unit weight on page 7 before
installing and ensure the supporting or suspension steel work
has sufficient load bearing capacity.
Wall Mounting:
1. Remove the wall bracket from CRYSTAL-AIRE
®
uv
2. Locate an appropriate area on the wall to mount the
CRYSTAL-AIRE
®
uv.
a. To allow for adequate flow, allow a minimum of 3 feet
empty space from the inlet or outlet of the CRYSTAL-
AIRE
®
uv
b. Wall or mounting location must be able to support
CRYSTAL-AIRE
®
uv (refer to weight specifications).
c. Recommend a minimum 3/8” X 2½” lag screw a mini-
mum of (4) places into a wooden stud or other
solid object.
3. There are (10) mounting holes in the wall mount bracket.
a. Use a minimum of (4) mounting holes across the top
cross bar when attaching the wall mount bracket to
the structure.
b. Equally space the fasteners for optimal support.
c. Level and fasten the wall mount bracket with fasteners
of sufficient length, strength, and type to support the
CRYSTAL-AIRE
®
uv (refer to weight specifications).
4. Remove the front cover from the unit for access to the
(4) 9/16” diameter mounting holes located along the top
edges of the unit.
5. Carefully lift and align the CRYSTAL-AIRE
®
uv into position
using a material lift or other supporting device.
a.
USE CAUTION WHEN LIFTING, UTILIZE LIFTING
DEVICES AS NEEDED TO SUPPORT CRYSTAL-
AIRE
®
uv WEIGHT!
6. Fasten the CRYSTAL-AIRE
®
uv to the mounting bracket
using the (4) ½” bolts, lock washers and nuts provided.
a. Torque the bolts to 57 ft lbs.
7. Once the CRYSTAL-AIRE
®
uv is mounted, replace
the front cover
8. Plug in the power cord to appropriate power supply.
9. The CRYSTAL-AIRE
®
uv is now ready for operation
CAUTION
!
D A N G E R
!
D A N G E R
LIFTING HAZARD
Summary of Contents for CRYSTAL-AIRE
Page 1: ...Modular Air Cleaning Systems Owner s Manual ...
Page 17: ...17 CRYSTAL AIRE uv SYSTEM WIRING DIAGRAM ...
Page 19: ...19 ...