66 – Pvd3675_Gb_Ey_Septembre_2017
4.4. Maintenance Operations
4.4.1. Summary maintenance operations
Generality
DANGER: The installation, commission and maintenance operations
must be performed by qualified personnel, in conjunction with this
documentation.
The qualified personnel must know the safety (C18510 authorization,
standard VDE 0105 or IEC 0364) and local regulations.
They must be authorized to install, commission and operate in
accordance with established practices and standards.
Please contact PARKER for technical assistance.
Special requirements for ATEX servomotors
Operation
Periodicity
Clean the motor
Every year
Motor inspection (vibration changes,
temperature changes, tightening
torques on all scews)
Every year
Cable inspection, no degradation
(colour, flexibility, cracks…)
Every year
Bearing replacement
Every 20 000h
Danger: Before any intervention, the motor must be disconnected from
the power supply.
Due to the presence of permanent magnets, a voltage is generated at
the terminals when the motor shaft is turning.
If an assembly screw of enclosure has to be replaced, the new one
screw must present a quality 8.8 or higher.
If the motor is used in dust explosive atmospheres, do not forget to do
a regular cleaning in order to avoid the deposits of dusts.
Summary of Contents for EY Series
Page 1: ...1 Pvd3675_Gb_Ey_Septembre_2017 Servomotors EY Series Technical Manual PVD 3675 EY Series...
Page 37: ...37 Pvd3675_Gb_Ey_Septembre_2017 3 3 Outline drawings 3 3 1 EY310E...
Page 38: ...38 Pvd3675_Gb_Ey_Septembre_2017 3 3 2 EY420E EY430E...
Page 39: ...39 Pvd3675_Gb_Ey_Septembre_2017 3 3 3 EY620E EY630E...
Page 40: ...40 Pvd3675_Gb_Ey_Septembre_2017 3 3 4 EY820E EY840E EY860E...
Page 44: ...44 Pvd3675_Gb_Ey_Septembre_2017 3 5 2 2 EY420 3 5 2 3 EY430...
Page 45: ...45 Pvd3675_Gb_Ey_Septembre_2017 3 5 2 4 EY620 3 5 2 5 EY630...
Page 46: ...46 Pvd3675_Gb_Ey_Septembre_2017 3 5 2 6 EY820 3 5 2 7 EY840...
Page 47: ...47 Pvd3675_Gb_Ey_Septembre_2017 3 5 2 8 EY860...