46
Parker Hannifi n Corporation
Hydraulic Pump/Motor Division
Greeneville, Tennessee USA
Service Manual
HP2 Series Hydrostatic Tandem Pumps
HY13-1521-M1/US
Assembly
Tighten and
torque bolts
Install two bypass
valves
Install shock
valves or check
valves (depending
on model)
32. Install the other two bolts into the front
housing and tighten all four bolts. Torque all
eight housing bolts to 31.9–38.6 Nm (282–342
in/lbs).
33. Liberally lubricate bypass valves around seal
area. Hand tighten and torque to 18.1–22.6 Nm
(160–200 in/lbs).
34. Install shock (33) or check (34) valves (de-
pending on model). Hand tighten and use an
11/16" or 1/4" allen wrench to tighten down.
Torque all four shock/check valves to 18–22 Nm
(160–200 in/lbs).
45