7 Commissioning
and
Operation
7.1 Commissioning
the
NitroFlow
®
HP
1. Make sure that the connections are correct and fixed properly.
2. Make sure that pressurized air pressure is available on the inlet.
3. Connect the unit to mains electricity by setting the main switch to the ON-position
4. Touch the start
-button (the NitroFlow
®
HP will start after a delay-time of 3
minutes (refer to §6.2.1).
5. Check whether the connections of the tubing between the NitroFlow
®
HP and the
application are free of leaks.
6. The oxygen content is factory preset according to order. To adjust the oxygen
content (fine tuning), adjust the flow with the flow control valve FCV. Decreasing
the flow will result in a decrease of the oxygen level and vice versa. The oxygen
level can be read on the display (refer to §3.3).
7. Check whether the system works according to the settings of the control system.
8. Close all sheet metal covers.
Important
The NitroFlow
®
HP must run with sheet metal covers mounted on the
unit; the sheet metal protects against external damage and
unauthorized adjustments.
7.2 Start
NitroFlow
®
HP
1. Set the power switch of the NitroFlow
®
HP in the on position. Start the NitroFlow
®
HP by touching the
-button on the screen.
2. The NitroFlow
®
HP will start after a delay-time of 3 minutes (refer to §6.2.1).
3. There is a 3 minutes delay between stop and restarting the generator.
7.3 Stop
NitroFlow
®
HP
1. Stop the system by touching the
-button on the screen
2. Before performing maintenance make sure the system is depressurized; check
the pressures in the system.
Important:
When stopping the system for maintenance, switch off the main
switch and isolate the generator from power supply.