7
Installation and Mounting
Installing the PowerGrip Bucket
onto the Carrier
Removing the PowerGrip Bucket
from the Carrier
PowerGrip Removal
PowerGrip Installation
1. Position the PowerGrip close to the carrier
boom to ensure easy use of the lifting reach
and range of the carrier boom.
2. Lower the dipper to approximately 2-3 inches
(50-75 mm) above the PowerGrip. Roll out the
bucket cylinder to lower the link bars to the
PowerGrip.
3. Align the PowerGrip and link bar holes and
install the link pin.
4. Slowly lift the PowerGrip to a safe height with
the bucket and boom cylinders.
5. Curl the bucket cylinder until the PowerGrip
and dipper holes align and install the bucket
pivot pin. Rotate the pins as necessary and
install the required retainers.
Each PowerGrip is engineered for a specific
backhoe or excavator and is designed to be pin
mounted directly to the machine. When using
All PowerGrip models should be mounted to the
carrier according to the instructions outlined below.
To remove the PowerGrip bucket follow the
instructions outlined below.
1. Position the bucket so it is lightly supported by
the ground and in a position so it will not move
or fall when a pin is removed.
2. Remove the bucket pivot and link pins.
6. Safety check. Check that the Helac
Attachment is fitting correctly by maneuvering
it with the machine and at the same time
watching for any interference or resistance to
movement that may exist. If there is any sign
of problems with the smooth functioning of
the PowerGrip, DO NOT attempt to carry out
any modifications to it, or the host machine.
Contact Helac's Customer Service Department
instead, and they will advise as necessary.
Universal or Hydraulic Quick Couplers, contact the
respective coupler manufacturer for instructions and
maintenance requirements.
INSTALLATION AND MOUNTING