192-011006N8 PSD1 Installation Guide
192-011006N8 2019-07
09.10.19 09:27
21 (109)
1
24 VDC
2
GND 24 VDC
3
DC power supply bus -
4
Protective earth
5
DC power supply bus +
Connecting protective earth
Connect protective earth via a copper wire of minimum
10 mm
2
by means of the provided screws at the bottom
of the PSD1M (axis controller) and of the mains module
PSD1-M_P:
2.10.5.
Conditions of utilization for the cUL certification of PSD1-S
In this chapter you can read about:
•
UL certification .......................................................................................................................... 21
•
Installations- & Environmental Characteristics PSD1-S............................................................. 21
•
Tightening torque of the wiring terminals .................................................................................. 23
•
Auxiliary connection – electrical ratings .................................................................................... 23
•
Data of integrated dynamic brake unit ...................................................................................... 23
•
In- / Output Ratings .................................................................................................................. 23
2.10.5.1
UL certification
Category
Specifications
Certified
E-File_No.: E142140
The UL certification is only valid if the type plate of the device shows the "UL" -sign.
PSD1-S:
UL61800-5-1 1st Edition, issued June, 8th, 2012
C22.2 No.274-13, 1st Edition, issued March, 2013
2.10.5.2
Installations- & Environmental Characteristics
PSD1-S
Risk of Electric Shock, wait at least 3 minutes with PSD1-S and 10 minutes with
PSD1-M before removing cover
•
Use in Pollution degree 2 Environment.
•
Maximum Surrounding Air Temperature 40 °C.