background image

Parker Hannifin Corporation

Industrial Gas Filtration 
and Generation Division

4087 Walden Avenue
Lancaster, NY 14086
phone 800 343 4048
www.parker.com/igfg

© 2020 Parker Hannifin Corporation. Product names are trademarks or registered trademarks of their respective companies 

 

         

IOM_PKE_SFC_122020_Adam

PN: 44-10300-0001

North America

Compressed Air Treatment

Industrial Gas Filtration and 

Generation Division

Lancaster, NY 
716 686 6400 
www.parker.com/igfg

Haverhill, MA 
978 858 0505 
www.parker.com/igfg

Engine Filtration  

Racor 

Modesto, CA 
209 521 7860 
www.parker.com/racor

Holly Springs, MS 
662 252 2656 
www.parker.com/racor

Hydraulic Filtration

Hydraulic & Fuel Filtration

Metamora, OH 
419 644 4311 
www.parker.com/hydraulicfilter

Laval, QC Canada 
450 629 9594 
www.parkerfarr.com

Velcon
Colorado Springs, CO 
719 531 5855 
www.velcon.com

Process Filtration 

domnick hunter Process Filtration

SciLog

Oxnard, CA 
805 604 3400 
www.parker.com/processfiltration

Water Purification

Village Marine, Sea Recovery, 

Horizon Reverse Osmosis

Carson, CA 
310 637 3400 
www.parker.com/watermakers

Europe

Compressed Air Treatment

domnick hunter Filtration & Separation 

Gateshead, England 
+44 (0) 191 402 9000  
www.parker.com/dhfns

Parker Gas Separations

Etten-Leur, Netherlands 
+31 76 508 5300 
www.parker.com/dhfns

Hiross Zander 

 

Essen, Germany 
+49 2054 9340 
www.parker.com/hzfd

Padova, Italy 
+39 049 9712 111 
www.parker.com/hzfd

Engine Filtration & 

Water Purification

Racor 

Dewsbury, England 
+44 (0) 1924 487 000  
www.parker.com/rfde

Racor Research & Development

Stuttgart, Germany 
+49 (0)711 7071 290-10

Hydraulic Filtration

Hydraulic Filter 

Arnhem, Holland 
+31 26 3760376 
www.parker.com/hfde

Urjala, Finland
+358 20 753 2500

Condition Monitoring

Parker Kittiwake

West Sussex, England 
+44 (0) 1903 731 470  
www.kittiwake.com

Process Filtration 

domnick hunter Process Filtration

Parker Twin Filter BV

Birtley, England 
+44 (0) 191 410 5121 
www.parker.com/processfiltration

Asia Pacific

Australia 

Castle Hill, Australia 
+61 2 9634 7777 
www.parker.com/australia 

China 

Shanghai, China 
+86 21 5031 2525 
www.parker.com/china

India

Chennai, India 
+91 22 4391 0700 
www.parker.com/india

Parker Fowler

Bangalore, India 
+91 80 2783 6794 
www.johnfowlerindia.com

Japan 

Tokyo, Japan 
+81 45 870 1522 
www.parker.com/japan

Korea 

Hwaseon-City 
+82 31 359 0852 
www.parker.com/korea 

Singapore

Jurong Town, Singapore 
+65 6887 6300 
www.parker.com/singapore

Thailand 

Bangkok, Thailand 
+66 2186 7000 
www.parker.com/thailand

Latin America

Parker Comercio Ltda. 

Filtration Division 

Sao Paulo, Brazil 
+55 12 4009 3500 
www.parker.com/br

 

Pan American Division 

Miami, FL 
305 470 8800 
www.parker.com/panam 

Africa

Aeroport Kempton Park, South Africa 
+27 11 9610700 
www.parker.com/africa

Worldwide Filtration Manufacturing Locations

Summary of Contents for SFC

Page 1: ...Downward Flow Cartridge Dust Collector Owner s Manual Model SFC...

Page 2: ...Parker Parker Order _________________________________________________________________ Unit Model ___________________________________________________________________ Unit Serial ______________________...

Page 3: ...odule Sections applies to 4 or more modules 6 3 4 Electrical Installation 11 3 4 1 Mounting the Controls 11 3 4 2 Solenoid Valve Enclosure Wiring 11 3 4 3 Heater Wiring 15 3 5 Compressed Air Connectio...

Page 4: ...Dust Removal 24 5 3 Servicing the Compressed Air Components 24 5 4 Servicing the Direct Drive Blower and Motor System 24 5 5 Servicing Cartridge Media 25 5 6 Servicing Optional Return Air Safety Filt...

Page 5: ...t collector The unit should be inspected frequently and dirt removed to prevent excessive accumulation which may result in flash over or fire damage The SFC system should not be used to support person...

Page 6: ...nt should be by a licensed contractor that is also experienced in potential fire and explosion hazards and adheres to related local state and federal codes standards laws and regulations Parker is not...

Page 7: ...v Page intentionally left blank...

Page 8: ...ding in non traffic areas even though the dust collector is equipped with an explosion vent 2 Introduction Thank you for selecting Parker dust collection equipment to assist you in your commitment to...

Page 9: ...nism provides brief bursts of compressed air directed through the diaphragm valves toward the cartridge filter This pulsing action dislodges the collected particles from the media where they fall into...

Page 10: ...crating strapping and hold down bolts Locate all hardware bags sealant and other assembly materials provided with your unit 3 Installation 3 1 Off Loading and Inspection SFC dust collector modules are...

Page 11: ...4 FIGURE 2 SFC Typical SINGLE UNIT Installation Diagram PARKER PARKER 44 10335 0001...

Page 12: ...5 FIGURE 3 Recommended Unit Clearances 44 10337 0001...

Page 13: ...hopper and filter module together Securely tighten all hardware at the filter module and hopper Recheck leg assembly sway braces to ensure they are tight Install fasteners bolt flat washer lock washer...

Page 14: ...7 FIGURE 4 Single Hopper SFC 44 10309 0001...

Page 15: ...8 FIGURE 5 Multiple Hopper SFC 44 10309 0002...

Page 16: ...9 FIGURE 6 Multiple Hopper SFC 44 10309 0003...

Page 17: ...10 FIGURE 7 Multiple Modules SFC 44 10310 0001...

Page 18: ...pulse cleaning Motor starter with Digital Pulse Control DPC for on demand pulse cleaning VFD with DPM for continuous pulse cleaning VFD with DPC for on demand pulse cleaning Refer to Parker sales orde...

Page 19: ...12 FIGURE 8 SFC Pressure Gauge Installation 44 10333 0001 Rev A...

Page 20: ...13 FIGURE 9 Solenoid Wiring to Pulse Controls for 2 3 4 and 5 Tier Units...

Page 21: ...14 FIGURE 10 Pneumatic Valve Assembly 44 10332 0001...

Page 22: ...l compressed air supply pipe fittings and connections 3 6 Assembly of Optional Equipment 3 6 1 Blower Purge Package Installation TIP OVER HAZARD Anchor dust collector to concrete pad prior to install...

Page 23: ...16 FIGURE 11 Legs Support Top Mount Blower 44 10331 0001 NOTE FOR BLOWERS 20 HP OR LARGER SUPPORT LEGS ARE REQUIRED TO BE INSTALLED UNDER THE CLEAN AIR PLENUM...

Page 24: ...17 FIGURE 12 Abrasive Inlet Installation 44 10338 0001...

Page 25: ...ry air lock Do not allow any object to be placed in or near the rotary air lock during operation Verify rotary air lock rotation matches rotation arrows affixed to assembly 3 6 4 Abrasive Inlet Instal...

Page 26: ...s not designed for dust storage The slide gate should remain open during normal operation 3 6 6 Inlet Cover and Blank Cover Plate Installation Inlet collar and blank cover plates bolt directly to the...

Page 27: ...20 FIGURE 16 EDAP Interconnection FIGURE 15 EDAP Installation 48 10007...

Page 28: ...transport an assembled 5 high unit due to height restrictions within the vehicle When shipping this unit it will be necessary to ship the EDAP separately This will require the customer to assemble th...

Page 29: ...interchange at motor junction box Engage starter disconnect switch start blower and recheck rotation NOTE Proper blower rotation is required to move the designed amount of air A blower rotating in the...

Page 30: ...23 FIGURE 17 SFC Series Door Filter Installation 44 10329 0001...

Page 31: ...timerboard to the Continuous Clean position Or if the system is sup plied with DPC Pulse Control place the Continuous Clean PS switch on the timerboard to PS position The MOT AUX terminals at the time...

Page 32: ...ace prior to being closed A flat solid section of door handle will be visible when door assembly is in the properly closed position Refer to Figure 17 If cam surface of the door handle is visible Quic...

Page 33: ...for HEPA filters TABLE 2 Cartridge Filters CARTRIDGE FILTER PARKER PART NUMBER GENERAL DESCRIPTION OF FILTER MEDIA ProTura Nanofiber 33 10089 ProTura Nanofiber layer on cellulose ProTura Nanofiber FR...

Page 34: ...l This may require bending panel sections away from the frame for frame removal Care should be taken to avoid sharp panel edges during this activity 4 Dispose of the removed rupture panel in accordanc...

Page 35: ...proper motor starter overload rating against full load amps on motor name plate Adjust or replace overloads as required Ensure drum is properly sealed against drum lid package Ensure drum lid package...

Page 36: ...ge to the timer board and voltage output from timer boards to solenoid valves Consult DPM DPC Pulse Control Panel Installation and Operation Manual for additional assistance Reduce high set point on D...

Page 37: ...30 7 Illustrated Parts FIGURE 21 SFC Series 44 10330 0001 FIGURE 22 SFC Series Explosion Vents...

Page 38: ...0020 20 Gallon Drum Lid 9 45 10022 0055 55 Gallon Quick Release Collar 9A 45 10022 0020 20 Gallon Drum Quick Release Collar 10 15 0233 14 Hose Clamp 11 15 0202 14 Flexible Duct 12 18 0944 14 Adapter...

Page 39: ...32 Page intentionally left blank...

Page 40: ...or misuse misapplication or normal wear and tear e Equipment not properly installed operated and maintained under normal conditions and recommended applications As Buyers exclusive remedy for any def...

Page 41: ...shooting effort details 5 Description of physical location and or environment details The Buyer shall cooperate with PARKER in its investigation and provide full information and documentation concerni...

Page 42: ...arker com dhfns Hiross Zander Essen Germany 49 2054 9340 www parker com hzfd Padova Italy 39 049 9712 111 www parker com hzfd Engine Filtration Water Purification Racor Dewsbury England 44 0 1924 487...

Reviews: