108 - PVD 3622_GB_TM_January 2014.Docx
4.4. Maintenance Operations
4.4.1.
Summary maintenance operations
Generality
DANGER: The installation, commission and maintenance operations must
be performed by qualified personnel, in conjunction with this documentation.
The qualified personnel must know the safety (C18510 authorization,
standard VDE 0105 or IEC 0364) and local regulations.
They must be authorized to install, commission and operate in accordance
with established practices and standards.
Please contact PARKER for technical assistance.
Operation
Periodicity
Section
number
Thrust bearing re-greasing
See §3.5.3
§4.4.2
Bearing re-greasing
Every 7000h @ 70°C
§4.4.2
Belt replacement
Every 15000h
§4.4.4
Belt tension checking
Every year
§4.4.4
No water condensation checking
Every year
§3.6.9
Cooling water quality inspection
Every year
§3.6.3
Summary of Contents for TM Series
Page 1: ...1 PVD 3622_GB_TM_January 2014 Docx Torque Motors TM Series Technical Manual PVD 3622...
Page 57: ...57 PVD 3622_GB_TM_January 2014 Docx 3 3 1 2 Shaft Height 200 mm Thrust bearing 29424...
Page 61: ...61 PVD 3622_GB_TM_January 2014 Docx 3 3 2 2 Shaft Height 315 mm Thrust Bearing 29426...
Page 62: ...62 PVD 3622_GB_TM_January 2014 Docx 3 3 2 3 Shaft Height 315 mm Thrust Bearing 29430...
Page 66: ...66 PVD 3622_GB_TM_January 2014 Docx 3 3 3 2 Shaft Height 400 mm Thrust Bearing 29434...
Page 67: ...67 PVD 3622_GB_TM_January 2014 Docx 3 3 3 3 Shaft Height 400 mm Thrust Bearing 29440...