HY13-1526-001-M1/US
Torqmotor™ Service Procedure
TC, TS, TB, TE and TJ Series
Parker Hannifin Corporation
Hydraulic Pump/Motor Division
Greeneville, TN 37745 US
37
4. Place housing (17) assembly into a soft
jawed vise with the coupling shaft bore
down, clamping against the mounting
flange. SEE FIGURE 39.
Place housing
assembly
into vise
Torqmotor™ Assembly
The TJ Torqmotor™ housing (17) requires
that you assemble a
new
backup washer
(15) & backup ring (16),
new
seal (14), with
the lip facing to the inside of Torqmotor (see
figure 57A),
new
thrust washer (13),
new
thrust bearing (12) and a
new
second thrust
washer (13) in that order before pressing in
the inner housing bearing (11).
SEE FIGURES 40A & 40B.
When these components are in place, press
new
bearing (11) into the housing (17) to
a depth of .03 inches (.76 mm) max for TJ
below the housing wear plate contact face.
Use the opposite end of the bearing mandrel
used to press in outer bearing (18). Refer-
ence Figure 2, in the “Tools and Materials
Required for Servicing” section.
SEE FIGURE 40C.
Figure 39
Figure 40
Figure 40A
Figure 40C
Figure 40B
Assemble
backup
washer & seal
5. TC, TS, TB & TE Torqmotors™ assemble a
new
backup ring (16),
new
backup washer
(15) and
new
seal (14) with the seal lip fac-
ing toward the inside of Torqmotor™ (see
Figure 57B), into their respective counterbo-
res in housing (17) if they were not assem-
bled in procedure 1.